My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-11-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 06-11-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 4:20:44 PM
Creation date
8/13/2015 4:05:33 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN TOWERS, INC. <br /> 3440 BA YSIDE ROAD ���1 N�� <br /> ORONO,MINNESOTA 55356 p <br /> 612-473.3660 FAX 612-473-3880 <br /> SEp �2 �g9g <br /> �j�p0►17t��11.5 <br /> September 21, 1998 Lj1' <br /> Mr.Dave Scherbel <br /> Building Official <br /> City of Arden Hills <br /> 4364 West Round Lake Road <br /> Arden Hills,Minnesota 55 104 <br /> Dear Mr.Scherbel: <br /> Mr. Steve Mangold of U.S.West Wireless,LLC has contacted me regarding the release of an <br /> engineers report by Paul J.Ford and Company. It has come to my attention that the reportwas prepared <br /> using information that is now obsolete. I do not believe that the engineers who prepared the report were <br /> able to actually observe the tower in order to prepare an accurate analysis which I personally would <br /> require. <br /> We are in the process of having anew study made using accurate information. As you know the <br /> tower was built under the standards existing at the time of its construction in 1981 The t��u was never <br /> designed to ayzthstand-Y2 inch of ice under 60 mile per hour winds conditions. However,the to%vr as it <br /> now stands,has withstood h inch ice under the most severe winter conditions in Minnesota during its <br /> existence. The exact dates are not available to me without some research,but I do recall those occurrences <br /> when we had electrical power outages due to ice storms. There is a considerable safety factor built into <br /> the engineers analysis to avoid liability. <br /> No one is more concerned about the structural integrity of the tower than the owner. We have <br /> been endeavoring to maintain the tower at its optimum safe capacity in accordance with our engineers <br /> recommendations. <br /> Sincerely, . <br /> D.R. Vaughan es. <br />
The URL can be used to link to this page
Your browser does not support the video tag.