My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-11-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 06-11-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 4:20:44 PM
Creation date
8/13/2015 4:05:33 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
determine the area of steel remaining. However to be abso- <br /> lutely sure that no rusting is taking place, each tower leg <br /> would have to be tested every square inch, which is not <br /> economically feasible. <br /> We are not implying that you do have rusting problems in the <br /> subject tower, we are simply stating that we cannot guaran- <br /> tee that no rusting is taking place and you should be aware <br /> of this. Our .stress. ratios as, shown in. our analysis and in <br /> the results section of this report are based on steel being <br /> F... .n <br /> inn-- new condition with no rusting or deterioration. <br /> Upon request Ehresmann Engineering Inc. will visit the <br /> previously described tower site and inspect tower, <br /> lines, <br /> and antennas for compliance to this engineering analysis in <br /> its entirety upon completion of project. Cost will be <br /> quoted at time of request. <br /> We would like to: point out the fact that we considered....this <br /> tower., <br /> to..be An near new condition when. completing our struc- <br /> tural „analysis Ido a 'lowarice 'was made for missing, corrod- <br /> ng or deteriorating tower members. <br /> This report is based on the following: <br /> 1. Tower <br /> membersproperly <br /> in goodinstalled <br /> condition�aintained. <br /> 2. All <br /> 3. All members in place. <br /> 4. All bolts in place and properly tightened. <br /> 5. Weep holes on tube and pipe members open. <br /> 6. Tower being in plumb condition with proper guy tension <br /> installed. <br /> 7. fabricated,tower installed mbers nand rmaintained operly iovergned�the tyears. <br /> fa <br /> Ehresmann Engineering Inc. is not responsible for any modi- <br /> fications completed prior to or hereafter which Ehresmann <br /> Engineering <br /> Inc. <br /> includenot <br /> butrarewas <br /> notnot <br /> limiteddirectly <br /> involved.. <br /> modifications to <br /> 1. Replacing or strengthening bracing members. <br /> 2. Reinforcing vertical members in any manner. <br /> 3. Adding or relocating stabilizers. <br /> 4. Installing antenna mounting gates or side arms . <br /> 5 . Changing guy sizes and related hardware. <br /> 6. installing new anchors and anchor shafts . <br /> 7. Extending tower. <br /> tes <br /> this <br /> Ehresmann resentseethegentire�reportyandathat titt oc <br /> assumes no <br /> went rep <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.