|
• STANDARD TERMS AND CONDMONS - TOWER ANALYSES y
<br /> Ehresmann Engineering, Inc. - 4400 W. 31st Street- Yankton, SD 57078
<br /> 0
<br /> Engineering consultations and tower analyses Provided by Ehresmann
<br /> Engineering, Inc.(hereinafter called EEI)are subject to the following terms and
<br /> conditions with respect to responsibilities of all parties (EEI, CLIENT, and/or
<br /> tower OWNER). Professional Engineering services performed by EEI, as
<br /> represented by EEI report, include analysis of the towers) in accordance with The report assumes also that the tower members and hardware are in place and
<br /> applicable codes, EIA, ANSI, UBC, considering the latest revisions, or as in good condition; bolts are properly tightened; weep holes on tube and pipe
<br /> indicated on the report,and compilation of a report based on the results of engi. members are open;tower is in plumb condition with proper guy tension; and all
<br /> neering analysis specifying areas of concern with recommendations to correct, members are galvanized or free of corrosion.
<br /> modify,or repair any discrepancies found at the site. Note: If tower assume
<br /> has never EEI s no liability for any damage or failure of the tower or any tower
<br /> been modified or no antennas added/removed, governing codes will have been component it such failure was due to inadequacies in engineering design,
<br /> erecting,materiah
<br /> those which were applicable at the time of tower erection unless otherwise detailing,fabricating, ,or maintenance
<br /> requested by CLIENT/OWNER; Modified or newly designed towers are analyzed
<br /> Recommended modifications outline the scope of work only and are not irroehhded
<br /> ID current codes. to imply sequence of work or construction procedures. Persons performing
<br /> Prior to tower analysis, CLIENT/OWNER will make available to EEI all known modification work will use safe and acceptable industry practices to effect
<br /> information regarding existing and proposed requirements which affect the work modifications,and will be responsible for compliance with all federal,state,and
<br /> to be performed. Information will include, but not be limited to specifications, local safety codes.
<br /> contracts,recommendations,plans,change orders,photographs,soil test reports
<br /> EEl will not be liable for any vice,incorrect adjudgment; or decision based on
<br /> and recommendations,local coft etc—
<br /> any inaccurate information furnished by CLIENT,and CLIENT will intlenniry EEI
<br /> Specific information required for tower structural analysis shall include the against all liability arising out of or contributed to by such irnformation.
<br /> tower location(state and cou*X tower model, height, and orientation on tower
<br /> site;as-0uilt drawings;tower leg,diagonal,and girt size with type and grade of N CLIENT/OWNER becomes aware of any information which is contrary to that
<br /> steel,and quantity/site of bolts; accurate antenna loading (show configuration contained in the report; or ii CLIENT/OWNER becomes aware of any defects
<br /> on bar,a guy azimuth of microwave dishes, &.1 soil analysis; location, size and arising from the original design, material,fabrication, and erection defic
<br /> grade Wall strand; location and sizes of feed lines, platforms, ladders and CLIENT/OWNER shall disregard said report and immediately notify EEI.
<br /> ef
<br /> other appurtenance; location and size of stabilizers;guy anchor radii;tower base
<br /> tips(pivot or fixed);and lourhdation design for tower and anchors. Often EEI is retained to provide partial engineering services for a project and is
<br /> not liable for portions of the project EEI is not retained to provide services for.
<br /> CLIENT will immediately transmit to EEI any new information which becomes Please refer to EEI's project consultant proposal-agrearrt•contract with the
<br /> available to it or its subcontractors, so that recommended actions, designs and CLIENT for scope of work.
<br /> drawings can be reviewed and new recomnrendA-Uns by EEI made, it needed•
<br /> CLIENT will provide a represerrbb11e to answer questions about the project when EEI's liability to CLIENT and all contractors and subcontractors on the Project.
<br /> for damages due to professional negligen
<br /> wired EEI upon 24 hours notice,if Pile• negligence,or breech of any other obligation to
<br /> or oth will be limited to the amount of EEI% fee received on the
<br /> req CLIENT ens,
<br /> ewerrf
<br /> arrangements are made in w' In the
<br /> arra �•
<br /> n Bled project unless other specific nge
<br /> Willing to provide the information spec P I� ,
<br /> H CLIENT/OWNER is unable or u n9 P use CLIENT does not wish to limit EEI's amount of liability on the project, EEI will
<br /> of the CLIENT/OWNE perform or ca
<br /> above, EEI will, upon written request n of the tower b obtain the necessary consider waiving this limitation on written notice from CLIENT received within
<br /> to be performed an on-site inspection 10 days after an agreement is fully executed or before EEI's work on the project
<br /> Information. begins, whichever is earlier. The CLIENT may request the size of insurarim
<br /> CLIENT/OWNER accepts lack of any information outlined above shall policy limits and time period of coverage, and CLIENT will pay additional
<br /> cause the tower to be ans!yzed or advice provided based on certain consideration equal to EEI's total insurance premium fee (when a policy b
<br /> assumption such as normal sort conditions, manufacturer's specifications. arranged Limitation on Liability. This 15%an insurance )charglus e isxas a charge for a Walver 0i
<br /> a charge for insurance and at
<br /> and professional engineering exPenerhce and judgmerht.
<br /> increase in consideration for the greater risk involved where work is petfornnec
<br /> Written analysis provided by EEI represents conditions as furnished above. EEI with no limitation of liability.
<br /> assumes no liability for any factual changes that may o=r after the date of the
<br /> report All rePresentalions, recommendations and conclusions of said report CLIENT will notify the OWNER and any contractor or subcontractor who perform;
<br /> were based upon the information contained and set forth in the report work in connection with any work done by EEI of the limitation of 1'nability for de
<br /> so defects, errors, omissions or professional negligence, and to require as ;
<br /> Prop
<br /> The report is wed on the.assumption that the tower and tower condition precedent to their performing their work, a Ik kWum*
<br /> * carr
<br /> cotnporrariss, including all modificaborhs or add'htans, were property limitation of liability on three part as against"EEI. In the event the CLI
<br /> designed, detailed,fabricated,erected, and maintained throughout the life to obtain a like limitation,CLIENT will indemnity EEI for any fiabBOY to it
<br /> d the toMrer. pad'
<br />
|