Laserfiche WebLink
( 1) Stabilize all exposed soils and soil stockpiles: <br /> (2) : Establish permanent vegetation; <br /> (3) Prevention. of sediment damage to. adjacent <br /> . ..properties and other., designated areas ; <br /> (4) Schedule erosion:.,and sediment. control practices ; <br /> (5) Use temporary sedimentation basins; <br /> (6) Engineer the construction of steep slopes; <br /> (7) Control the storm water leaving a site. <br /> (8) Stabilize all waterways and outlets; <br /> (9) Protect storm sewers from the entrance of <br /> sediment; <br /> (10) When working in or crossing water bodies <br /> take precautions to contain sediment; <br /> (11) Resta.bilize utility .construction areas as <br /> soon as possible;. ,. .. <br /> (12) Protect paved, roads.. from..sediment and mud <br /> brought in from access routes; _. <br /> (13) Dispose of temporary erosion and sediment control <br /> measures; and <br /> (14) Maintain all temporary and permanent erosion and <br /> sediment control practices. <br /> 4.2. Plan. The erosion and sediment control plan shall <br /> include: <br /> (1) Project description - The nature and purpose of <br /> the land-disturbing activity and the amount of <br /> grading involved. <br /> 5 <br />