Laserfiche WebLink
condition instead of returned to the same condition. This is also addressed in right of way <br /> restoration--should state that it will be restored to new or better condition. <br /> 5. Permit application submission requirements--should include in the application scaled drawings <br /> showing the location of all existing roadways and public or private utilities. <br /> 6. Right of Way restoration--states that the permittee may choose to have the City to restore the <br /> right of way. This should be amended to state that the permittee will patch its own work. <br /> 7. City Restoration and Permittee Restoration--suggested that the time limits for restoration be <br /> reduced from 36 months to 12 months. <br /> 8. Installation requirements--the language "the standard specifications for street openings" should <br /> be replaced with "Engineering Standards adopted by the PUC". <br /> 9. Undergrounding--The City Engineer questioned this section's relevance. However,this language <br /> has been adopted by surrounding communities in their ordinances. <br /> Recommendation <br /> Staff recommends adoption of the Right-of-Way Ordinance with the changes outlined in this <br /> memorandum. <br /> \\Bds-01\sys\USERSUENNIFER\Planning Commission Cases\City Council Memo\2000\00-39 ROW Ordinance2.doc <br /> 2 <br />