My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-11-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 06-11-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 4:20:44 PM
Creation date
8/13/2015 4:05:33 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> 2. Definition of"Equipment"(page 3 or 4/32)—propose to change this definition to,"...means any <br /> tangible asset used to install,repair or maintain facilities in any right-of-way or which obstructs <br /> any right-of-way". <br /> 3. The City does not currently have excavation or obstruction permits (page 4 or 5/32). They should <br /> be a combined permit when the ordinance is adopted. <br /> 4. Definition of"Restore"(page 5 or 6/32)—should state that the right-of-way should be restored <br /> to new or better condition instead of returned to the same condition. This is also addressed in <br /> right of way restoration (page 11, 12/32)—should state that it will be restored to new or better <br /> condition. <br /> 5. Permit application submission requirements (page 10 or 11/32)--should include in the <br /> application scaled drawings showing the location of all existing roadways and public or private <br /> utilities. <br /> 6. Right of Way restoration(page 12 or 13/32)—states that the permittee may choose to have the <br /> City to restore the right of way. This should be amended to state that the permittee will patch its <br /> own work. <br /> 7. City Restoration and Permittee Restoration(page 12 or 13/3)sug�that the a limits for restoration be reduced from 36 months to 12 months. <br /> 8. Installation requirements(page 16 or 17/32�—the language"the standard specifications for street <br /> openings"should be replaced with"Engineering Standards adopted by the PUC". <br /> 9. Undergrounding (page 20 or 21/32)—The City Engineer questioned this section's relevance. <br /> However, this language has been adopted by surrounding communities in their ordinances. <br /> `7 Recommendation <br /> Staff recommends that the City Council review the proposed Ordinance and direct staff to make any <br /> necessary changes. The Ordinance will be presented to the City Council a second time, at the next <br /> regular City Council meeting on June 11, 2001, for a public hearing and adoption. <br /> Ck <br /> VD - <br /> �l k0) fin, <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.