My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-31-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
08-31-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 4:28:41 PM
Creation date
8/31/2015 11:13:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City approved a second amendment to the Master PUD and a Preliminary Plat in March <br />2015 for the subdivision of Lot 3, where the existing retail center is located, into three smaller <br />lots (Planning Case 15-002). Planning Case 15-002 also included modifications to the retail <br />center parking lot and an increase in the Phase III building footprint. The new plat is titled Arden <br />Plaza 2nd Addition, and Lot 1 within the plat is proposed for the Tavern Grill development. <br /> <br />The Master PUD specifically identifies the Lexington Avenue site where the Tavern Grill <br />development is proposed as Phase III. It should be noted that Phase II of the Master PUD has not <br />yet been completed. Phase II will include the development of the parcel on County Road E <br />adjacent to the Walgreens pharmacy for a 6,000 square foot user. Arden Plaza, LLC continues to <br />market this site to potential buyers and tenants. <br /> <br /> <br />Overview of Request <br /> <br />Hemisphere Restaurant Partners has requested a Final PUD for Phase III of the Arden Plaza <br />Master PUD to develop Lot 1, Arden Plaza 2nd Addition for a sit-down restaurant called the <br />Tavern Grill Restaurant and Bar. The Master PUD Site Plan shows Phase III being developed as <br />a 20,136 square foot retail building. The proposal by Hemisphere Restaurant Partners would <br />result in an overall lower density development on the site than what was originally approved for <br />Phase III. The development plans are in substantial conformance with the Master PUD plans. <br /> <br />Hemisphere currently operates three Tavern Grills in the Twin Cities metro, with locations in <br />Edina, Woodbury, and Blaine. The proposed Tavern Grill in Arden Hills would be similar to <br />these other restaurants and would provide a relaxed, up-scale atmosphere. The development <br />would include the restaurant building, which would have a footprint of 9,500 square feet, and an <br />attached 3,050 square foot outdoor patio area for seasonal seating. <br /> <br />The proposed site design orients the front of the restaurant towards the other buildings within the <br />Arden Plaza retail center. The main entrance would be located at the southwest corner of the <br />building and feature a prominent tower comprised primarily of transparent glass. The exterior <br />materials on the building would include stucco, stone, and wood, and each façade would have at <br />least 20 percent transparent window coverage. A variety of shade and ornamental trees, shrubs, <br />and perennial plantings would be focused around the perimeter of the building and patio area and <br />would also provide screening of trash collection and utility areas. Safe pedestrian connections <br />will be created with sidewalks that connect to the public sidewalk on Lexington Avenue and the <br />internal sidewalks within the retail center. <br /> <br /> <br />Plan Evaluation <br /> <br />A full evaluation of the proposal was presented to the Planning Commission at their regular <br />meeting on August 5, 2015. The staff report to the Planning Commission on this case is included <br />as Attachment I. The Planning Commission recommended that the developer provide additional <br /> <br />City of Arden Hills <br />City Council Meeting for August 31, 2015 <br />P:\Planning\Planning Cases\2015\PC 15-016 - Arden Plaza - Final PUD Phase III\Memos_Reports_15-016 <br />Page 2 of 8
The URL can be used to link to this page
Your browser does not support the video tag.