Laserfiche WebLink
The applicant has noted that shopping centers typically rely on a parking ratio of 4.0 stalls per <br />1,000 square feet of gross leasable area. This is supported by a study completed by the National <br />Parking Association and the Urban Land Institute, titled Dimensions of Parking, which <br />recommends 4.0 – 4.5 stalls per 1,000 square feet of building space in shopping centers less than <br />600,000 square feet in size. According to the Parking Generation study completed by the <br />Institute of Traffic Engineers (4th Edition), the average peak parking demand for shopping <br />centers is 2.04 to 2.94 vehicles per 1,000 square feet of building area, depending on the day of <br />the week. At the 85th percentile, the study showed demand of 2.39 to 3.90 vehicles per 1,000 <br />square feet of building area. The 405 parking stalls that would be provided at the retail center <br />equates to a ratio of 4.96 stalls per 1,000 square feet of gross building square footage. <br /> <br />The Planning Commission was supportive of staff’s conclusion that 405 parking stalls will be <br />adequate to accommodate demand following the completion of Phase III. Going forward, staff <br />recommends that the City evaluate parking needs for the retail center based on the ratio in the <br />Dimensions of Parking study of 4.0 – 4.5 stalls per 1,000 square feet of building space. This will <br />allow for an easier evaluation of parking needs for Phase II of the Master PUD and any future <br />redevelopment on the site. Once all three phases have been completed, the retail center will <br />include 440 parking stalls, which will be a ratio of 5.25 stalls per 1,000 square feet of building <br />space. <br /> <br /> <br />Traffic Study and Transportation Improvements <br /> <br />A traffic study was completed in 2007 to evaluate the full build-out of the Arden Plaza retail <br />center. An additional study was completed in 2008 in conjunction with the B-2 District Guiding <br />Plan that looked at the redevelopment of Arden Plaza in addition to other development <br />opportunities along County Road E. The Phase III development proposal is in substantial <br />conformance with the development scenarios evaluated in these traffic studies and an additional <br />study was not requested at this time. The application does not propose any alterations to the <br />internal circulation plan as shown in the previously approved Master PUD. <br /> <br />As part of the City’s approval of the Master PUD in 2009, Arden Plaza was required to construct <br />certain transportation improvements. One condition was that the development of Phase III would <br />be contingent on the construction of a traffic signal located 650 feet west of the County Road E <br />and Lexington Avenue intersection. This traffic signal was proposed as part of the transportation <br />improvements included in the Guiding Plan for the B-2 District. The signal was recommended <br />based on the assumption that the Holiday Inn site north of Arden Plaza would be redeveloped <br />into a 95 apartment unit building and a 120,000 square foot office building. The 2007 Arden <br />Plaza traffic study did not indicate that a new signal would be warranted. At the time, Ramsey <br />County also did not support the traffic signal due to spacing between the Lexington Avenue <br />intersection and the proposed signal. <br /> <br />City staff discussed the Phase III development plans with the Ramsey County Public Works <br />Department and a letter from the County addressing traffic control on County Road E has been <br /> <br />City of Arden Hills <br />City Council Meeting for August 31, 2015 <br />P:\Planning\Planning Cases\2015\PC 15-016 - Arden Plaza - Final PUD Phase III\Memos_Reports_15-016 <br />Page 4 of 8