My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-15-WS
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2015
>
09-09-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 9:12:43 AM
Creation date
9/8/2015 9:10:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff is requesting that the Planning Commission review the proposed amendments and discuss <br />whether they adequately communicate the City's intent behind the fagade transparency <br />requirements. <br />Next Steps <br />Based on the direction provided by the Planning Commission, staff will bring the suggested <br />revisions to the B-2 and B-3 District Design Standards to a City Council work session for <br />review. The Planning Commission would then be asked to hold a public hearing and make a <br />formal recommendation on any amendments to the Design Standards at a future meeting. <br />AttarhmPnk <br />A. Working Draft: Section 1325.05, Subd 8. — Red -lined Version <br />City of Arden Hills <br />Planning Commission Work Session for September 9, 2015 <br />P: IPlanninglPlanning Cases120MPC 15-019 - Zoning Code Amendment - B-2 & B-3 Design Standards - Window <br />TransparencylMemos_Reports_15-019 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.