My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
09-28-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 10:50:16 AM
Creation date
9/25/2015 3:49:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL – AUGUST 31, 2015 4 <br /> <br />County Road E in the overnight hours. Staff recommended approval of the night work <br />construction activity waiver. <br /> <br />Councilmember Holmes asked if the construction work would increase costs for the project. <br /> <br />Public Works Director Maurer reported that there would be no additional cost to the City but <br />would offer the contractor additional hours of work with minimal traffic on County Road E. <br /> <br />MOTION: Councilmember McClung moved and Councilmember Holden seconded a <br />motion to Approve the Night Time Construction Activity Waiver for the <br />County Road E mill and overlay portion of the project between Tuesday, <br />September 1 and Friday, September 4, 2015. The motion carried (5-0). <br /> <br /> B. Planning Case 15-016 – Final PUD Phase III – Arden Plaza – 3527-3557 <br />Lexington Avenue North <br /> <br />Associate Planner Bachler stated that the City approved a Master PUD for the Arden Plaza retail <br />center at County Road E and Lexington Avenue in 2009 (Planning Case 09-011). The approved <br />plans included the demolition of an existing office building and the phased redevelopment of the <br />site to be completed in three stages. A total of 97,035 square feet of retail and commercial <br />building space was approved at the time. For each successive phase of the redevelopment, a Final <br />PUD plan is required to verify general conformance with the Master PUD and to provide more <br />detailed development plans for the phase to be implemented. <br /> <br />Associate Planner Bachler explained that the Master PUD was amended in 2011, to include a <br />revised subdivision plan and updated development plans for the existing Walgreens Pharmacy <br />(Planning Case 11-016). Phase I of the Master PUD was completed in 2012, and included the <br />construction of the Walgreens building, modifications to parking and circulation within the retail <br />center, and the construction of stormwater basins required for the proposed build-out of the site. <br /> <br />Associate Planner Bachler indicated that the City approved a second amendment to the Master <br />PUD and a Preliminary Plat in March 2015, for the subdivision of Lot 3, where the existing retail <br />center is located, into three smaller lots (Planning Case 15-002). Planning Case 15-002 also <br />included modifications to the retail center parking lot and an increase in the Phase III building <br />footprint. The new plat is titled Arden Plaza 2nd Addition, and Lot 1 within the plat is proposed <br />for the Tavern Grill development. <br /> <br />Associate Planner Bachler commented that the Master PUD specifically identifies the Lexington <br />Avenue site where the Tavern Grill development is proposed as Phase III. He noted that Phase II <br />of the Master PUD has not yet been completed. Phase II will include the development of the <br />parcel on County Road E adjacent to the Walgreens pharmacy for a 6,000 square foot user. Arden <br />Plaza, LLC continues to market this site to potential buyers and tenants. <br /> <br />Associate Planner Bachler reported that Hemisphere Restaurant Partners has requested a Final <br />PUD for Phase III of the Arden Plaza Master PUD to develop Lot 1, Arden Plaza 2nd Addition for <br />a sit-down restaurant called the Tavern Grill Restaurant and Bar. The Master PUD Site Plan <br />shows Phase III being developed as a 20,136 square foot retail building. The proposal by
The URL can be used to link to this page
Your browser does not support the video tag.