My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-31-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2015
>
08-31-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2015 12:55:12 PM
Creation date
9/29/2015 12:55:07 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—AUGUST 31, 2015 4 <br /> County Road E in the overnight hours. Staff recommended approval of the night work <br /> construction activity waiver. <br /> Councilmember Holmes asked if the construction work would increase costs for the project. <br /> Public Works Director Maurer reported that there would be no additional cost to the City but <br /> would offer the contractor additional hours of work with minimal traffic on County Road E. <br /> MOTION: Councilmember McClung moved and Councilmember Holden seconded a <br /> motion to Approve the Night Time Construction Activity Waiver for the <br /> County Road E mill and overlay portion of the proiect between Tuesday, <br /> September 1 and Friday, September 4, 2015. The motion carried (5-0). <br /> B. Planning Case 15-016 — Final PUD Phase III — Arden Plaza — 3527-3557 <br /> Lexington Avenue North <br /> Associate Planner Bachler stated that the City approved a Master PUD for the Arden Plaza retail <br /> center at County Road E and Lexington Avenue in 2009 (Planning Case 09-011). The approved <br /> plans included the demolition of an existing office building and the phased redevelopment of the <br /> site to be completed in three stages. A total of 97,035 square feet of retail and commercial <br /> building space was approved at the time. For each successive phase of the redevelopment, a Final <br /> PUD plan is required to verify general conformance with the Master PUD and to provide more <br /> detailed development plans for the phase to be implemented. <br /> Associate Planner Bachler explained that the Master PUD was amended in 2011, to include a <br /> revised subdivision plan and updated development plans for the existing Walgreens Pharmacy <br /> (Planning Case 11-016). Phase I of the Master PUD was completed in 2012, and included the <br /> construction of the Walgreens building, modifications to parking and circulation within the retail <br /> center, and the construction of stormwater basins required for the proposed build-out of the site. <br /> Associate Planner Bachler indicated that the City approved a second amendment to the Master <br /> PUD and a Preliminary Plat in March 2015, for the subdivision of Lot 3, where the existing retail <br /> center is located, into three smaller lots (Planning Case 15-002). Planning Case 15-002 also <br /> included modifications to the retail center parking lot and an increase in the Phase III building <br /> footprint. The new plat is titled Arden Plaza 2nd Addition, and Lot 1 within the plat is proposed <br /> for the Tavern Grill development. <br /> Associate Planner Bachler commented that the Master PUD specifically identifies the Lexington <br /> Avenue site where the Tavern Grill development is proposed as Phase III. He noted that Phase II <br /> of the Master PUD has not yet been completed. Phase II will include the development of the <br /> parcel on County Road E adjacent to the Walgreens pharmacy for a 6,000 square foot user. Arden <br /> Plaza, LLC continues to market this site to potential buyers and tenants. <br /> Associate Planner Bachler reported that Hemisphere Restaurant Partners has requested a Final <br /> PUD for Phase III of the Arden Plaza Master PUD to develop Lot 1, Arden Plaza 2nd Addition for <br /> a sit-down restaurant called the Tavern Grill Restaurant and Bar. The Master PUD Site Plan <br /> shows Phase III being developed as a 20,136 square foot retail building. The proposal by <br />
The URL can be used to link to this page
Your browser does not support the video tag.