My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-12-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
10-12-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2015 2:28:16 PM
Creation date
10/9/2015 2:27:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM <br />NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE QTY. TOTAL PRICE QTY. TOTAL PRICE <br />THIS PERIOD ORIGINAL CONTRACT TOTAL TO DATE <br />7 2504.602 ADJUST VALVE EACH -1.00 345.00 0.00 $0.00 0.00 $0.00 <br />8 2504.602 CONNECT TO EXISTING WATERMAIN EACH -10.00 1,858.00 0.00 $0.00 1.00 $1,858.00 <br />9 2504.602 INSTALL HYDRANT AND VALVE EACH 4.00 4,937.00 0.00 $0.00 4.00 $19,748.00 <br />10 2504.602 8" GATE VALVE AND BOX EACH 1.00 1,710.00 0.00 $0.00 0.00 $0.00 <br />11 2504.602 WATER SERVICE CONNECTION EACH 34.00 604.00 0.00 $0.00 34.00 $20,536.00 <br />12 2504.603 1" WATER SERVICE LF 950.00 30.90 667.00 $20,610.30 950.00 $29,355.00 <br />13 2504.603 6" WATERMAIN LF 1,920.00 26.00 0.00 $0.00 1,920.00 $49,920.00 <br />14 2504.603 12" WATERMAIN LF 400.00 41.40 0.00 $0.00 390.00 $16,146.00 <br /> ALTERNATE 2.0 - ADDITIONAL WATERMAIN -- TOTAL $26,725.50 $151,023.96 <br />BID SUMMARY <br />SCHEDULE 1.0 - STREET (GRANT/NOBLE) -- TOTAL $81,723.94 $418,262.37 <br />SCHEDULE 2.0 - STREET (VENUS/CRYSTAL) -- TOTAL $486,306.92 $984,278.00 <br />SCHEDULE 3.0 - STORM -- TOTAL $176,196.85 $496,888.30 <br />SCHEDULE 4.0 - WATERMAIN -- TOTAL $102,419.70 $662,637.18 <br />SCHEDULE 5.0 - SANITARY SEWER -- TOTAL $18,285.00 $19,419.50 <br />SCHEDULE 6.0 - ASBURY AVENUE -- TOTAL $0.00 $17,361.00 <br /> ALTERNATE 2.0 - ADDITIONAL WATERMAIN -- TOTAL $26,725.50 $151,023.96 <br />TOTAL BID SUMMARY THIS PERIOD $891,657.91 <br />TOTAL BID SUMMARY TO DATE $2,749,870.31 <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON SITE <br />MATERIAL DEDUCT. <br />PREVIOUS PAYMENTS <br />AMOUNT DUE <br />TOTAL THIS PERIOD <br />$891,657.91 <br />$42,493.53 <br />$0.00 <br />$0.00 <br />********************************** <br />$849,164.38 <br />$0.00 <br />$1,763,212.41 <br />$849,164.38 <br />$0.00 <br />TOTAL TO DATE <br />$2,749,870.31 <br />THIS PERIOD TOTAL TO DATE <br />$137,493.52 <br />5
The URL can be used to link to this page
Your browser does not support the video tag.