My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-26-15-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
10-26-15-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 10:36:32 AM
Creation date
10/23/2015 1:27:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> <br />any thirty (30) day period, Subscribers shall be credited pro rata for such interruption, upon <br />request. <br /> <br />3. Technical Standards. The technical standards used in the operation of the System <br />shall comply, at minimum, with the technical standards promulgated by the FCC relating to <br />Cable Systems pursuant to Title 47, Sections 76.601 to 76.617, as applicable, as may be <br />amended or modified from time to time, which regulations are expressly incorporated herein by <br />reference. <br /> <br />4. Special Testing. <br /> <br />a. The City shall have the right to inspect all construction or installation work <br />performed pursuant to the provisions of the Franchise. In addition, the <br />City/Commission may require special testing of a location or locations within the <br />System if there is a particular matter of controversy or unresolved complaints <br />regarding such construction or installation work or pertaining to such location(s). <br />Demand for such special tests may be made on the basis of complaints received or <br />other evidence indicating an unresolved controversy or noncompliance. Such <br />tests shall be limited to the particular matter in controversy or unresolved <br />complaints. The City shall endeavor to so arrange its request for such special <br />testing so as to minimize hardship or inconvenience to Grantee or to the <br />Subscribers caused by such testing. <br /> <br />b. Before ordering such tests, Grantee shall be afforded thirty (30) days following <br />receipt of written notice to investigate and, if necessary, correct problems or <br />complaints upon which tests were ordered. The City shall meet with Grantee <br />prior to requiring special tests to discuss the need for such and, if possible, <br />visually inspect those locations which are the focus of concern. If, after such <br />meetings and inspections, City wishes to commence special tests and the thirty <br />(30) days have elapsed without correction of the matter in controversy or <br />unresolved complaints, the tests shall be conducted at Grantee’s expense by a <br />qualified engineer selected by City and Grantee, and Grantee shall cooperate in <br />such testing. <br /> <br />5. Drop Testing and Replacement. The Grantee shall replace, at no separate charge <br />to an individual Subscriber, all Drops and/or associated passive equipment incapable of passing <br />the full System capacity at the time a Subscriber upgrades. <br /> <br />6. FCC Reports. The results of any tests required to be filed by Grantee with the <br />FCC shall upon request of City also be filed with the City or its designee within ten (10) days of <br />the conduct of such tests. <br /> <br />7. Interconnection. The System servicing the Cities of Arden Hills, Falcon Heights, <br />Lauderdale, Little Canada, Mounds View, New Brighton, North Oaks, Roseville, and St. <br />Anthony shall continue to be completely interconnected. In addition, Grantee shall make <br />available for interconnection purposes one (1) channel for forward video purposes, one (1) six
The URL can be used to link to this page
Your browser does not support the video tag.