My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
August 1978
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
1966-1979 Town Crier
>
1978
>
August 1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 10:59:02 AM
Creation date
11/9/2015 10:26:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Controversy is a-brewin' at the Arden Manor Mobile Home Park also, The <br />owner promised certain projects would be completely done by June 30, and is <br />bonded to see that they are, The residents are complaining that many things <br />are still unfinished and that the owner is very difficult to talk to about it, <br />A discussion was to have been held at the June 26 Council meeting, but the <br />owner never showed up, although a dozen or so people from the Park (and mel.) <br />waited several hours for him, <br />At the July 10 Council meeting, the owner said that most of the delays in <br />construction have been caused by the heavy rains and he requested a time ex- <br />tension until September 30 to finish everything. It was explained that the <br />Council's concern is completion of Arden Manor as per the Amended Special Use <br />Permit. Some of the things not finished includes the swimming pool, tennis <br />courts, equipment for the park, the fence along Highway 96, and final land- <br />scaping. Several residents have lived in partially sodded lots since last fall, <br />and with all the rain, the mud is terrible. <br />Anyway, the Council decided to check the contracts that the owner of the <br />Park has with the various construction companies (swimming pool, fence, etc,) <br />to make sure that they were dated to be completed by June 30. If it is truly <br />not the owner's fault that these things are not done, a time extension will.be <br />granted. The City is not anxious to take over responsibility for completion <br />of Arden Manor. <br />School District 621 has asked Arden Hills for help in providing equip- <br />ment and manpower to renovate the softball field at Moundsview High School and <br />the softball field and hockey rink at Johanna Junior High School. Our Parks <br />Director pointed out to the Council that AH extensively uses the ballfield8 <br />at these two schools, plus the ones at Johanna Flementary and Valentine Hills. <br />Along with Perry Park, all scheduled ball games are held at these fields, thus <br />freeing our other parks for neighborhood use,_ The -estimated cost -to thev -1 <br />lage of helping the School District would be $900-$1200. <br />The Council feels that the City has its mown ma.intainance responsibilities <br />and that it is the School District's obligation to maintain its own fields, <br />After all, "do they come and help us plow snow?" Besides, Johanna Junior High <br />School is in Roseville. The Council voted not to participate in the School <br />District renovation project. <br />POTPOURR"T t The opening of the Northwestern National Bank branch on F .has <br />been delayed approximately a month because of the rai,ns.....Research is be.i g <br />carried out on cable TV to Arden Hills; more later,,,..,Water installation_for <br />the northwestern part of our Village has been approved; not gixi.te as extensive <br />as originally planned, but not quite as narrow as the second plan, Of course <br />there are still people who will get the water and have to pay for it that don't <br />want it, and there are a few who want it that won't get it, but this new lay- <br />out seems to satisfy the majority...... <br />Neighbors at the Hamline Ave, -Floral Drive intersection have appealed to <br />the Public Safety Committee for help with the traffic on this corner. The <br />drivers coming up off the freeway are moving pretty fast, and it, makes the en- <br />trance to Floral Drive rather challenging.,....Public Works plans to make an <br />addition to their current building. They plan to do the Arden Hills thing,and <br />disguise it with redwood and shrubs... Misre have ,been 6 breaks in the water main <br />on County Road E by McGuirets in recent years. The cost of repair to the next - <br />to -last break was $8000; the cost of this last one is not yet known. It is <br />thought that soil conditions, material used in the mains and heavy traffic on <br />E are causing the breaks. The City Engineer is investigating, <br />Who is responsible for the bales of hay that blew onto County Road E-2 <br />by Valentine Hills during one of our wind storms? One resident nearly hit them. <br />
The URL can be used to link to this page
Your browser does not support the video tag.