My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-08-Special
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2008
>
03-20-08-Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 7:04:51 AM
Creation date
11/10/2015 10:47:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills - Comprehensive Plan- DRAFT <br /> Pathways: Bikeways, Sidewalks and Trails <br /> The 2002 Arden Hills Park, Trails, and Open Space (PTOS) Plan <br /> discusses future bikeway, sidewalk and trail locations. Future shoulder, <br /> bikeway, sidewalk, and trail locations are also discussed in the geometric <br /> design standards section of Appendix X, to be pursued along or adjacent <br /> to most collector roadways. For each of the County highways within <br /> Arden Hills, roadway shoulders, in addition to trails and sidewalks, are <br /> recommended on both sides of the roadway to accommodate pedestrian, <br /> bicycle, and other non-motorized travel where feasible. <br /> The City will review pedestrian facilities and school routings to determine <br /> their adequacy as traffic conditions change. Shoulders, bikeways, <br /> sidewalks and trails will be integrated with the roadway system to provide <br /> routes for non-motorized traffic to access existing and future controlled <br /> intersections. Non-motorized facilities are to be incorporated into road <br /> projects and land redevelopments to safely accommodate pedestrians and <br /> bicycles with vehicle traffic in the City, as the City grows. <br /> While pathways are an integral part of the City's transportation system, <br /> specific pathway needs are described in Chapter 9: Parks and Recreation. <br /> The improvements and expansions in that chapter are required to ensure <br /> a sound transportation within Arden Hills. <br /> DRAFT 81 <br /> 3/14/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.