Laserfiche WebLink
PARTIAL PAY ESTIMATE #6 <br />FROM: <br />TO: <br />CONTRACTOR: PARK CONSTRUCTION CO. <br />ADDRESS: 1481 81st AVENUE NE, SPRING LAKE PARK, MN 55432 <br />OWNER: CITY OF ARDEN HILLS <br />PROJECT: <br />SUBSTANTIAL COMPLETION DATE AMOUNT OF CONTRACT <br />July 31,2015 ORIGINAL: 1,349,913.06 $ <br />REVISED: <br />ITEM <br />NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE QTY. TOTAL PRICE QTY. TOTAL PRICE <br />SCHEDULE 1.0 - STREET <br />1 2021.501 MOBILIZATION LUMP SUM 1.00 $60,000.00 0.00 $0.00 1.00 $60,000.00 <br />2 2101.502 CLEARING TREE 7.00 $505.00 0.00 $0.00 16.00 $8,080.00 <br />3 2101.507 GRUBBING TREE 7.00 $202.00 0.00 $0.00 16.00 $3,232.00 <br />4 2104.501 REMOVE PIPE DRAIN LIN FT 70.00 $5.65 0.00 $0.00 24.00 $135.60 <br />5 2104.501 REMOVE SEWER PIPE (STORM) LIN FT 16.00 $18.00 0.00 $0.00 18.00 $324.00 <br />6 2104.501 REMOVE CURB & GUTTER LIN FT 2,797.00 $6.55 0.00 $0.00 3,356.00 $21,981.80 <br />7 2104.503 REMOVE BITUMINOUS WALK SQ FT 478.00 $4.05 0.00 $0.00 611.00 $2,474.55 <br />8 2104.503 REMOVE CONCRETE WALK SQ FT 6,548.00 $1.25 0.00 $0.00 8,302.00 $10,377.50 <br />9 2104.503 REMOVE CONCRETE NOSE SQ FT 444.00 $4.30 0.00 $0.00 444.00 $1,909.20 <br />10 2104.503 REMOVE CONCRETE MEDIAN SQ FT 4,155.00 $1.60 0.00 $0.00 4,155.00 $6,648.00 <br />11 2104.505 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD 289.00 $15.10 0.00 $0.00 334.30 $5,047.93 <br />12 2104.505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 498.00 $7.65 0.00 $0.00 753.00 $5,760.45 <br />13 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 1,988.00 $9.50 0.00 $0.00 2,462.00 $23,389.00 <br />14 2104.509 REMOVE LIGHT UNIT EACH 16.00 $345.00 0.00 $0.00 16.00 $5,520.00 <br />15 2104.509 REMOVE DRAINAGE STRUCTURE EACH 3.00 $348.00 0.00 $0.00 3.00 $1,044.00 <br />16 2104.509 REMOVE LIGHT FOUNDATION EACH 16.00 $454.00 0.00 $0.00 15.00 $6,810.00 <br />17 2104.509 REMOVE SIGN TYPE C EACH 20.00 $40.40 0.00 $0.00 20.00 $808.00 <br />18 2104.509 REMOVE MARKER EACH 5.00 $35.40 0.00 $0.00 5.00 $177.00 <br />19 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 820.00 $3.55 0.00 $0.00 1,236.00 $4,387.80 <br />20 2104.523 SALVAGE HYDRANT EACH 1.00 $283.00 0.00 $0.00 1.00 $283.00 <br />21 2104.523 SALVAGE SIGN EACH 14.00 $40.40 0.00 $0.00 14.00 $565.60 <br />22 2104.523 SALVAGE DELINEATORS & MARKERS EACH 6.00 $35.40 0.00 $0.00 6.00 $212.40 <br />23 2104.601 REMOVE CABLES LUMP SUM 1.00 $1,590.00 0.00 $0.00 1.00 $1,590.00 <br />24 2104.601 RELOCATE SPRINKLER SYSTEM A LUMP SUM 1.00 $4,490.00 0.00 $0.00 1.00 $4,490.00 <br />25 2104.601 RELOCATE SPRINKLER SYSTEM B LUMP SUM 1.00 $4,490.00 0.00 $0.00 1.00 $4,490.00 <br />26 2104.603 REMOVE AND REPLACE BITUMINOUS PAVEMENT LIN FT 230.00 $20.00 0.00 $0.00 321.00 $6,420.00 <br />27 2106.607 EXCAVATION - COMMON (P) CU YD 1,864.00 $22.70 0.00 $0.00 1,864.00 $42,312.80 <br />28 2106.607 COMMON EMBANKMENT (CV) (P) CU YD 25.00 $68.70 0.00 $0.00 25.00 $1,717.50 <br />29 2106.607 SELECT GRANULAR EMBANKMENT (CV) (P) CU YD 598.00 $37.10 0.00 $0.00 0.00 $0.00 <br />30 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 10.00 $126.00 0.00 $0.00 2.00 $252.00 <br />31 2211.503 AGGREGATE BASE (CV) CLASS 5 (P) CU YD 1,319.00 $30.40 9.00 $273.60 1,926.00 $58,550.40 <br />32 2231.604 BITUMINOUS PATCH SPECIAL SQ YD 427.00 $59.90 0.00 $0.00 1,547.60 $92,701.24 <br />33 2232.501 MILL BITUMINOUS SURFACE (2.0") SQ YD 18,204.00 $1.15 0.00 $0.00 19,250.00 $22,137.50 <br />34 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (4,C) TON 2,860.00 $84.30 0.00 $0.00 3,252.06 $274,148.66 <br />35 2360.502 TYPE SP 12.5 NON-WEARING COURSE MIXTURE (4,B) TON 317.00 $77.90 0.00 $0.00 255.05 $19,868.40 <br />36 2411.618 MODULAR BLOCK RETAINING WALL SQ FT 580.00 $23.80 42.52 $1,011.98 966.52 $23,003.18 <br />37 2502.521 6" PE NON PERF PIPE DRAIN LIN FT 74.00 $18.70 0.00 $0.00 68.00 $1,271.60 <br />38 2503.511 15" RC PIPE SEWER CLASS V LIN FT 22.00 $64.70 0.00 $0.00 31.00 $2,005.70 <br />39 2503.511 18" RC PIPE SEWER CLASS V LIN FT 8.00 $68.80 0.00 $0.00 0.00 $0.00 <br />40 2503.602 CONNECT TO EXISTING STORM SEWER EACH 3.00 $1,000.00 0.00 $0.00 3.00 $3,000.00 <br />41 2504.602 CONNECT TO EXISTING WATERMAIN EACH 1.00 $1,490.00 0.00 $0.00 1.00 $1,490.00 <br />42 2504.602 INSTALL HYDRANT EACH 1.00 $5,120.00 0.00 $0.00 1.00 $5,120.00 <br />TOTAL TO DATE <br />ORIGINAL: <br />REVISED: <br />ORIGINAL CONTRACT <br />September 5, 2015 <br />November 27, 2015 <br />COUNTY ROAD E IMPROVEMENTS <br />THIS PERIOD <br />1