Laserfiche WebLink
GENERAL CONDITIONS 00700 - 2 <br /> <br />CHANGE ORDER #1 <br />(Attachment) <br /> <br /> <br /> <br />This contract is amended as follows: <br /> <br />WHEREAS: irrigation repairs were necessary due to impacts within the project limits outside <br />of those anticipated in the plans. <br /> <br />WHEREAS: It was determined that an adjustment was necessary to a Ramsey County survey <br />monument that was within the project limits; and <br /> <br />WHEREAS: The Engineer directed the Contractor to make the modifications to the irrigation <br />system and survey monument. <br /> <br />NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: <br /> <br />1. The Contractor shall complete the above described changes and additions to the project. <br /> <br />2. Payment for the work was reviewed and approved by the Engineer. <br /> <br />3. The Contractor will not make claim of any kind or character for any other costs or <br />expenses that he may have incurred or that he may hereafter incur in performing the <br />work or furnishing the materials of this agreement. <br /> <br /> <br /> <br />