My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-21-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
12-21-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 4:13:19 PM
Creation date
12/18/2015 4:10:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Figure 4. Example of a typical 5 MW solar farm layout <br />ELECTRICAL COLLECTION SYSTEM <br />The system will collect the direct current electricity (DC) electricity generated by PV modules <br />within its array to combiner boxes similar to what is shown in Figure 5. Combiner boxes are <br />protected by fuses or breakers and are about two feet by two feet square and affixed to the <br />racking system. Cables from the combiner boxes are placed underground in trenches one to <br />two feet wide, at a depth defined by the National Electrical Code (typically two to three feet <br />deep). Trenches are backfilled with screened native soil after cable installation. Cables from
The URL can be used to link to this page
Your browser does not support the video tag.