My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-21-15-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2015
>
12-21-15-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 4:13:19 PM
Creation date
12/18/2015 4:10:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />AUTOMATED FACILITY CONTROL AND MONITORING SYSTEM <br />An integrated project wide supervisory and data acquisition (SCADA) system will be installed to <br />cover each facility. It will have the capability to be remotely operated with real-time control <br />over most operational functions. Operations at an individual facility will be performed from <br />time to time as required for certain component tests, resets and troubleshooting activities. One <br />or more meteorological stations up to 15 feet tall will be installed at the facility. This will <br />provide an additional data source to the SCADA system.
The URL can be used to link to this page
Your browser does not support the video tag.