My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-16-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
02-16-16-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 9:08:49 AM
Creation date
2/16/2016 8:59:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Terminal Road) <br />County Road B2 <br />(City Centre Drive) <br />County Road C <br />(Cleveland Avenue) <br />County Road 46 <br />Long Lake Road <br />County Road D <br /> Street)th (5 <br />County Road E2 <br />County Road 88 <br />County Road 10 <br />County Road H <br />R <br />a <br />i l <br />r <br />o <br />a <br />d <br />R <br />o <br />s <br />e <br />g <br />a <br />t e <br />(Lake Valentine Road) <br />County Road F <br />Bridge <br />Railroad <br />County Road 96 <br />Creek <br />Rice <br /> Avenueth 5 <br />Old Highway 8 <br />10 <br />35W <br />35W 10 <br />694 <br />35W <br />10 <br />County Road H County Road I <br /> Avenue)th (85 <br />County Road J <br />Service Road <br />(Lake Drive) <br />County Road 23 <br /> Avenue)th (95 <br />County Road 52 <br />County Road 53 (Sunset Avenue) <br />Creek <br />Rice <br />From Park & Ride <br />County Ditch 53-62 <br />35W <br />(Lexington Avenue) <br />County Road 17 <br />1 2 3 <br />7 <br />12 <br />4 AUX <br />11*9A <br />H <br />: <br />\ <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />7 <br />5 <br />7 <br />4 <br />\ <br />H <br />I <br />- <br />M <br />U <br />\ <br />B <br />a <br />s <br />e <br />\ <br />8 <br />5 <br />9 <br />8 <br />_ <br />e <br />n <br />h <br />a <br />n <br />c <br />e <br />m <br />e <br />n <br />t <br />s <br />_ <br />s <br />c <br />h <br />e <br />m <br />a <br />t <br />i <br />c <br />_ <br />g <br />r <br />a <br />p <br />h <br />i <br />c <br />_ <br />p <br />r <br />e <br />f <br />e <br />r <br />r <br />e <br />d <br />_ <br />r <br />e <br />v <br />. <br />d <br />g <br />n <br />I-35W NORTH PROJECT SCOPE <br />- *MnDOT STILL INVESTIGATING FLYOVER ALTERNATIVE AT TH 694 <br />- ADD LANES ON OUTSIDE AS SHOWN IN BLUE. <br /> START IN SPRING 2019. <br />- APPROXIMATE COST $208 MILLION - ESTIMATE CONSTRUCTION <br />- ALL LANES PAVED WITH CONCRETE FROM CR C TO SUNSET AVE. <br /> CR C AND ONE AT CR I) ALL OTHER BRIDGES WILL BE LEFT AS-IS. <br />- ORANGE INDICATES BRIDGES THAT WILL BE REPLACED (FOUR AT <br /> WHICH WILL BE A MNPASS LANE, FROM CR C TO LEXINGTON AVE. <br />- ADD ONE LANE IN EACH DIRECTION IN THE MIDDLE, <br />NOTES:
The URL can be used to link to this page
Your browser does not support the video tag.