My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4D, 2011 PMP Feasibility Report
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
11-15-10-S
>
4D, 2011 PMP Feasibility Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:23:28 AM
Creation date
2/19/2016 4:13:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXISTING UTILITY CONDITIONS <br />City utilities located within the project limits include storm sewer, water, and sanitary sewer. A <br />summary of the City's utilities are listed below. Private utilities include gas, electric, cabl�; <br />television, and telephone. <br />Storm Drainage System <br />All of the streets under consideration have existing storm sewer pipes, catch basins, and <br />manholes. City staff has reviewed all catch basins and manholes within the project ]imits to <br />identify maintenance that should be performed. The recommended storm drainage sy:�tern <br />maintenance is discussed later in this report. <br />Water System <br />The existing conditions for the water system were obtained from City as-built drawings. "The <br />following is a table of the existing watermains with information on pipe size, pipe mater�al, ;�nc� <br />history of watermain breaks. <br />Street <br />Amble Road <br />Arden View Court <br />Arden View Drive <br />Arden View Drive Ent/Exit <br />Colleen Court <br />Dellwood Street <br />Janet Court <br />Nursery Hill Court <br />Nursery Hill Lane <br />Wyncrest Court <br />Wyncrest Lane <br />Wynridge Drive <br />Pipe <br />Size <br />g» <br />6,� � g,� <br />6» � g„ <br />6" <br />6" <br />6" <br />6" <br />6" <br />6" <br />6" <br />6" l 12" <br />Pipe <br />Material <br />Ductile Iron <br />Cast Iron <br />Cast Iron <br />Ductile Iron <br />Ductile Iron <br />Ductile Iron <br />Ductile Iron <br />Ductile Iron <br />Ductile Iron <br />Ductile Iron <br />Ductile Iron <br />Watermain Break Histo <br />2 breaks recorded prior to 2004 <br />4 breaks recorded prior to 2004 <br />Public Works staff has inspected the hydrants and gate valves within the project limits to <br />determine if improvements are necessary. The recommended water system maintenanc�: 15 <br />discussed later in this report. <br />Sanitary Sewer S sy tem <br />The existing conditions for the sanitary sewer system were obtained from City as-built drtiw�ngs <br />and televised recordings performed by the Public Works Department. The following is a table c�f� <br />the existing sanitary sewer with information on pipe size, pipe material, and any probler�ls rioted <br />from the televising. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.