My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4D, 2011 PMP Feasibility Report
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
11-15-10-S
>
4D, 2011 PMP Feasibility Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:23:28 AM
Creation date
2/19/2016 4:13:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.1�1�� <br />-�zS. EN HILLS <br />2011 Pavement Management Program <br />' <br />I , <br />I � <br />' <br />' <br />' <br />� <br />' <br />' <br />' <br />LJ <br />2011 Pavement Manaqement Proqram: <br />The City of Arden Hills is responsible for the upkeep of <br />approximately 30 miles of city streets within its <br />boundaries. This includes seasonal maintenance <br />activities such as snow removal, crack sealing, street <br />patching, sweeping, as well as structural maintenance of <br />the pavement. The City has implemented a pavement <br />management program to assist in maintaining and <br />monitoring the performance of the paved street network. <br />This program strives to expend iax payer funds in a cost <br />effective manner in order to ensure the most value for <br />residents. The core function of this program is to <br />provide a systematic approach to street rehabilitation <br />and repair in order to assure that the City streets are <br />serviceable, safe, functional, and provided at a <br />reasonable cost to meet the needs of our residents and <br />the traveling public. <br />Each year infrastructure needs are evaluated based on <br />the City's Pavement Management Program and <br />assessment of utility infrastructure. Streets in marginal <br />condition are recommended for major maintenance by <br />mill and overlay. Streets in poor condition are <br />recommended for reconstruction. <br />At their meeting on August 30, the Arden Hills City <br />Council ordered the preparation of the Feasibility Report <br />for the 2011 Pavement Management Program (PMP) to <br />consider improvements on the following streets: <br />■ Amble Road, from Hamline Avenue to dead end, <br />■ Arden View Court, from Hamline Avenue to cul-de- <br />sac, <br />■ Arden View Drive, from Arden View Court to 761' <br />east of Royal Hills, <br />■ Colleen Court, from Colleen Avenue to cul-de-sac, <br />� Dellwood Street, from Nursery Hill Court to Amble <br />Road, <br />• Janet Court, from Lake Valentine Road to cul-de- <br />sac, <br />• Nursery Hill Lane, from Hamline Avenue to Nursery <br />Hill Court <br />■ Nursery Hill Court, from Nursery Hill �ane to cul-de- <br />sac, <br />■ Wyncrest Court, from Hamline Avenue to cul-de-sac, <br />• Wyncrest Lane, from Wyncrest Court to Wynridge <br />Drive, <br />■ Wynridge Drive, from Wyncrest Court to cul-de-sac. <br />Process: <br />Before a feasibility report is prepared, we need to collect <br />data for the proposed project. In the upcoming weeks, <br />the City Public Works and Engineering staff will be in <br />your neighborhood documenting the existing conditions. <br />We will use this data to develop plans showing proposed <br />improvements. <br />A portion of the street reconstruction cost is proposed to <br />be assessed to property owners. On the back of this <br />page is an informational sheet about the City's <br />Assessment Policy. <br />We anticipate that the Public Hearing for this project will <br />be in November. The project will not proceed to design <br />and construction until after the Public Heariny has been <br />conducted and authorized by the City Council. <br />Public Information Meetinqs: <br />The public process starts with a series of Information <br />Meetings. A kick-off ineetinq will be held: <br />Thursday, September 23, 2010, <br />6:30 to 8:00 p.m., Arden Hills City Hall <br />(1245 W. Hwy 96) <br />Staff will present the City's Pavement Management <br />Program-typical roadway construction, typical <br />assessment amounts and how they are calculated, and <br />answer any general questions you may have concerning <br />the potential improvement of your street. We do not <br />have formal plans for this project yet. This will be your <br />opportunity to discuss the proposed project and share <br />with us your thoughts. <br />Project Cantacts: <br />Terry Maurer, Public Works Director (fi5'� �"'��- ��!� i <br />terry,maurer@ci.arden-hills. mn.us <br />Kristine Giga, Civi1 Engineer (651) 792��`8�3� <br />kristine.gigaC�ci.arden-hills.mn.us <br />Matt Woodruff, Civil Engineer (65�)'����"���'� <br />matt.woodruff@ci.roseville.mn.us <br />Check out our website for information and updates as <br />the project progresses: <br />www.ci.arden-hills.mn.us/pmp <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.