My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, MnDOT I-694/TH51 Improvement Project - Appeal Board Appointee
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
01-10-11-R
>
8A, MnDOT I-694/TH51 Improvement Project - Appeal Board Appointee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:29:44 AM
Creation date
2/26/2016 11:01:22 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />whatever the cosis are above and beyond the $3250 per decibel per benefiting resident. This <br />option has much more uncertainty to the city than does the lump sum option. <br />Please be aware that the installation of approximately 2000 feet of the 3000 foot noise watt wiq <br />impact exisfing trees in the area. Some of these trees are mature Oak trees and other areas are <br />very dense clusters of trees. So, the impacts will be very large. <br />3— The City requests that MnDOT commit that fifl ge»erated on the project will first stay on the <br />project and be used for sound mitigation berming in all areas where noise walls are not proposed. <br />Addifional fill material, if it exists, should be used for berming along both sides of I-694 west of the <br />project limits_ <br />Mn/DOT response — MnlDOT has investigated potential berming areas on the project. In looking <br />at berming areas, it is necessary to took at areas that would allow berming within the existing R/W_ <br />The only area where berming can be constructed within the existing R/W is on the south side of I- <br />694 west of old TH 10. Mn/DOT is able to berm in this location while avoiding the area needed for <br />ponding. The 6erm will be constructed meeting Mn/DOT design standards for clear zone setbacks, � <br />drainage requirements and wetland impacts. There will be impacts to mature trees with this <br />berming. MnlDOT will identify these impacts and requests that these impacts be discussed and <br />agreed to by Arden Hills. <br />4— The City requests that MnDOT prove thaf the traffic modeling for the I-694/TH 51 improvement <br />considered the entire region and the effect the proposed grade separated intersection of TH 10/CR <br />96 with the loss of some movements will have on the entire transportation system. Furthermore, <br />the City wants MnDOT modeling to documeni that the proposed improvement wil cause no harm <br />and actually provide benefit to the county and local road system beyond Hamline Avenue, County <br />Road F, Lexington Avenue, County Road E and Lexington Bridge over /-634. <br />Mn/DOT response — Mn/DOT can confirm thaf the traffic modeling for this project has considered <br />the entire region and fhe effect the proposed grade separated intersection of TH 10/CR 96 has on <br />ii. In addition, Mn/DOT wiN prepare an exhibit showing the 2010 tra�c counts for the local roadway <br />system for both the no build and fhe build condition. This exhibit wilt show the locat tra�c <br />conditions resulting from both projects. <br />5— The City requests that MnDOT commit that there are no city costs associated with the <br />proposed improvements necessary on inferstate, county or locai system (including changes that <br />might be required on County Roads E, F, Hamline Avenue, Lexington Avenue or fhe junctions <br />� <br />An Equaf Opportunity Employer <br />....��31f � , � " '• <br />.y 'xi�,r`5' S �' � T _ � ' � ' � .. <br />� � ����.��� � . '�� • � 4 �l � �:. �. . <br />� <br />�,. .. . �, <br />
The URL can be used to link to this page
Your browser does not support the video tag.