My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-29-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
02-29-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 3:38:19 PM
Creation date
2/26/2016 3:36:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />Planning Commission Meeting for February 3, 2016 <br />P:\Planning\Planning Cases\2016\PC 16-004 - Boston Scientific - Site Plan Review\Memos_Reports_16-004 <br /> <br />Page 7 of 9 <br />5. The location of the proposed skyway and the proposed modifications to the parking lot <br />north of Building 10 are generally consistent with the approved Campus Master Plan. <br />6. A 4,147 gross square foot addition to Building 10 would be required to tie the skyway <br />into the established internal circulation of the building. <br />7. The proposal is in conformance with underlying I-1 Zoning District requirements and the <br />approved PUD. <br />8. The proposed modifications to the Building 10 parking lot include the removal of 26 <br />parking stalls. <br />9. Boston Scientific has accounted for these removed stalls with an additional 26 “proof of <br />parking” spaces in the Campus Parking Plan. <br />10. The proposal is not expected to adversely affect the surrounding neighborhood or the <br />community as a whole. <br /> <br /> <br />Staff Recommendation <br /> <br />Based on the submitted plans and findings of fact, staff recommends approval of Planning Case <br />16-004 for a Site Plan Review to construct a skyway between Buildings 3 and 10 and complete <br />minor modifications to the parking lot on the north side of Building 10 at 4100 Hamline Avenue <br />North. If the Planning Commission recommends approval of this request, staff recommends that <br />the following twelve (12) conditions be included with the approval: <br /> <br />1. The project shall be completed in accordance with the plans submitted as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City <br />Planner, shall require review and approval by the Planning Commission and City <br />Council. <br />2. The applicant shall continue to abide by all previous Development Agreements, Master <br />PUD approvals, and subsequent PUD Amendment approvals. <br />3. All necessary City permits for the construction of the skyway and modifications to the <br />parking lot on the north side of Building 10 shall be obtained by September 1, 2017, or an <br />extension request shall be submitted in writing to the City at least forty-five (45) days <br />prior to the expiration date. <br />4. Final construction plans shall be subject to approval by the City Building Official, City <br />Engineer, and Fire Marshall prior to the issuance of a Building Permit. <br />5. Final grading, drainage, and utility plans shall be subject to approval by the City Engineer <br />prior to the issuance of a Grading and Erosion Control Permit. <br />6. The existing temporary at-grade enclosed pedestrian walkway between Buildings 3 and <br />10 shall be removed within sixty (60) days of the skyway connection receiving final <br />approval by the City Building Official. <br />7. The applicant shall submit a financial surety in the amount of 125% of the estimated <br />costs of landscaping prior to the issuance of any development permits. The financial <br />surety shall be in the form of a letter of credit issued by a FDIC-insured Minnesota bank. <br />The purpose of the letter of credit is to ensure that landscaping is completed in the event <br />that the Developer defaults on this Agreement. The City will hold the letter of credit for
The URL can be used to link to this page
Your browser does not support the video tag.