My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-16 Joint WS with PTRC
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
03-21-16 Joint WS with PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2016 3:05:39 PM
Creation date
3/18/2016 3:02:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br />Because of the developed status of the City, park dedication funds are not anticipated to be a significant <br />source of additional funding for park and trail improvements. The City may have to rely more on general <br />funds and other revenues for needed replacement and improvements. <br />Implementation Recommendations 2002-2006 <br />The following are the implementation actions recommended to the PTRC. These projects should be <br />reviewed and adjusted annually. Funding should be secured and actions plans developed to assure imple- <br />mentation of these projects. <br />Trails <br />• Purchase a maintenance vehicle capable of both summer and winter trail maintenance. $95,000. <br />• Railroad Bridge Crossing over I-35W. Work with MNDOT and the Railroad to utilize existing <br />railroad bridge for a trail crossing over the interstate. (ISTEA Grant, funding from Arden Hills, <br />New Brighton and Ramsey County). $ to be determined. <br />• Assist with construction of a railroad underpass between Tony Schmidt and Perry Park (work with <br />County and railroad). $32,000 / City share. <br />• Charles Perry Park – Add a N-S trail connection with the county (pending county acquisition of <br />underpass) from the railroad to Mounds View High School. Add a trail connection from parking <br />lot to pump house. Replace bridge across wetland opposite pump house road. $35,000. <br />• Lobby for a pedestrian/bike bridge/lanes over TH51 at County Road E. Work with county and <br />state to move it to their priority list. $0 - staff and committee time. <br />• Obtain the trail along County E built from Old Snelling to east of TH 51 (county project). <br /> $ to be determined. City share if any of trail construction. <br />• Make trail connections from Tony Schmidt to the diagonal trail (trail should be named) through <br />Sampson and Hazelnut Parks. $20,000. <br />• Connect Crepeau Park to County Road E trail along Pine Tree Drive. $30,000. <br />• Work with MNDOT to obtain trail crossings of TH96, including a grade separated crossing, to <br />connect City Hall and TCAAP with the area south of TH96. $ to be determined City share, if <br />any. <br />• Work to complete a trail around the south end of Lake Johanna to Lydia Avenue. $ to be <br />determined. <br />• Round Lake Trail – Obtain remaining easements and complete the trail along west Round Lake. <br />$25,000.
The URL can be used to link to this page
Your browser does not support the video tag.