My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-26-04 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1999-2009
>
2004
>
10-26-04 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:06:27 AM
Creation date
4/7/2016 2:05:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2005-2009 Priorities <br /> • Walkway under RR connecting Tony Schmidt Park to <br /> Perry Park and trails. <br /> • Trail along old Snelling from Hwy 51 to 96. <br /> • Trail through Northwestern College. <br /> • Trails within the 10-96 reconstruction. <br /> • Trail over old RR bridge across I-35W, allowing <br /> connection to Long Lake Park. <br /> • Trail and footbridge crossing 51 at Old Snelling. <br /> • Trail from Old Snelling to Long Lake Park: Parkshore <br /> Drive, Gateway Blvd, old RR bridge across 35W. <br /> • • Trail/sidewalk along west side of Lexington from Co <br /> Rd E to 694. <br /> • Trail along N. Snelling from Briarknoll to 96. <br /> • Trail through marsh to link library with existing <br /> trails. <br /> • Trail along west side of Round Lake. <br />
The URL can be used to link to this page
Your browser does not support the video tag.