My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-18-06 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1999-2009
>
2006
>
04-18-06 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 12:08:30 AM
Creation date
4/8/2016 12:29:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Freeway andHazelnut Warming House Repair Estimates <br /> FREEWAY <br /> Option I Estimate*, OptioH 2 Estiniate* <br /> Roofing Materials: <br /> Shingles $110.00 <br /> Rolled Felt $30.00 <br /> Nails $6.00 <br /> Total $146.00 $146.00 $146.00 <br /> Soffit, Fascia and Trim $618.00 $618.00 $618.00 <br /> Insulation $185.00 $185.00 $185.00 <br /> Attic Odor Sealer $40.00 $40.00 $40.00 <br /> Caulking Bricks $30.00 $30.00 $30.00 <br /> Ceiling Material: <br /> 1/2 Inch $228.00 <br /> 3/8 Inch $192.00 $228.00 $192.00 <br /> Flooring Material: <br /> 1/4 Inch Treated $444.00 <br /> V2 Inch CDX Plywood $145.00 $444.00 $145.00 <br /> Paint 50.00 1 $50.00 $50.00 <br /> Total $1,741.00 Total $1,406.00 <br /> , HAZELNUT <br /> Optio I Estimate* Option 2 Estimate* <br /> Roofing Materials: <br /> Shingles $110.00 <br /> Rolled Felt $30.00 <br /> Nails $6.00 <br /> Total $146.00 $146.00 $146.00 <br /> Siding(east side only): <br /> 3/8 4x8 Tongue and <br /> Grooved Primed $100.00 $100.00 $100.00 <br /> Insulation $185.00 $185.00 $185.00 <br /> Ceiling Material: <br /> 1/2 Inch $228.00 <br /> 3/8 Inch $192.00 $228.00 $192.00 <br /> Flooring Material: <br /> 3/4 Inch Treated $444.00 <br /> '/2 Inch CDX Plywood $145.00 $444.00 $145.00 <br /> Paint 50.00 $50.00 $50.00 <br /> Total $1,153.00 Total $818.00 <br /> A dumpster rolloff would be needed if the buildings were to be removed. The cost is <br /> $285.00 for a 20 yard dumpster. A dumpster would be needed at each building site. <br /> *The estimates do not include the cost of labor. <br /> \\Metro4net.us\Ardentrills\PR&PW'\Parks\Freeway and Hazelnut Warming House Repair Estimate 03-06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.