My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-18-06 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1999-2009
>
2006
>
04-18-06 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 12:08:30 AM
Creation date
4/8/2016 12:29:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lits:15,e Hsu tLtUlKit, wft�. -i� b:j2'(ye(bbb <br /> SINCE 19" jVC0JAtP0- <br /> OFFICE NUMBER <br /> 26n 9r Lane NEE 763.571.IM <br /> Blaine,MN I��'E FAX NUMBER <br /> 5W9763.571.4735 <br /> DESIGN CUSTOM BUILD <br /> An foua►0PP&*0t Employer <br /> City of Arden Hills <br /> ATIM.,Tim Pemn DATE: March 30, 2M <br /> FROM:Brian Kovter NOTES:Please review <br /> 6r+fin�aootAab+s <br /> tgt Park work—services for fighting NO.Of PAGES: 1 <br /> Jim. <br /> Per site review: <br /> Freeway Fork: <br /> • Demo wiring from existing stnxxwe <br /> • Provide a new stlf-standing structure created out of posts and treated plywood for the new <br /> panel and ureter to be mounted to. <br /> + Provide a new utility meter socket and I00-amp panel <br /> • Trenching from new panel to the existing utility pole <br /> • New conduit and wiring from panel to utility pole <br /> * Cotutect to existing wiring going to pole lights(this will be figured on site on how to this <br /> will be dome) <br /> Permit fees included <br /> Above'work complete at time and material not to exceed S3,825.00 <br /> Valentine Park: <br /> • Prav_ide and itsstall ono new loo-amp service one the existing service pole with a new <br /> teeter socket <br /> • Wire iuto existing light oo pole <br /> • Pemit fee <br /> Above work not to exceed$1,423.00 <br /> Hu4nut Park: <br /> r provide a post and plywood base to mount panel on <br /> • Attsah new panel to plywood <br /> Provide wiring to existing light pole circuits fmm new panel <br /> Above work not to exceed S 1,6C0.00 <br /> Please call with any questions <br /> Thankyou, <br /> Sian Kovar ~..... <br /> (President <br />
The URL can be used to link to this page
Your browser does not support the video tag.