My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-16-Joint WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2016
>
03-21-16-Joint WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 6:34:24 AM
Creation date
4/13/2016 8:35:58 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION—MARCH 21, 2016 5 <br /> that the City had a cooperative agreement with the County. He also stated that if Kimley Horn <br /> requested an increase in fees, they must receive City approval first. <br /> Councilmember Holmes asked how the City was financing its portion of the final design costs <br /> and when would bonding occur. <br /> Interim City Administrator/Director of Finance and Administrative Services Iverson stated <br /> that the fees could be paid out of the interfund loan from PIR Fund. This would then be tracked in <br /> the TCAAP capital fund. She also noted interest had been taken into consideration. The bonding <br /> process could not begin until a master developer is selected. <br /> Acting Public Works Director Anderson noted that a new water tower and booster station were <br /> included in the final design plans but would not be constructed right away. The preliminary report <br /> estimated the water tower size to be 1 million or 1.5 million gallons, which are standard sizes and <br /> more cost-effective. <br /> Community Development Director Hutmacher stated this analysis was being performed now <br /> so that costs can be distributed amongst all users and not just the individuals that purchase their <br /> property later. <br /> This item is scheduled to be on the Consent agenda at the March 28, 2016, regular City Council <br /> meeting. <br /> Mayor Grant recommended proceeding to a discussion of agenda item I.E. as the PTRC <br /> members were not yet present and were scheduled for 6:30 pm. <br /> C. I-694 Non-Motorized Crossing Study <br /> Mayor Grant invited Gina Mitteco and Sheila Kauppi of MnDOT as well as the PTRC members <br /> to the work session table for this discussion. Introductions were made by all. <br /> Gina Mitteco of MnDOT provided an overview of the study which originated during the <br /> municipal consent process for the reconstruction of the I-694/TH 51 interchange. The City had <br /> asked for logical locations for non-motorized crossings along the I-694 corridor in Arden Hills <br /> and specifically desired a trail crossing at Snelling Avenue and I-694. <br /> Gina Mitteco stated that the study had expanded to include additional partners such as Ramsey <br /> County's Public Works and Active Living representatives as well as other cities along the <br /> corridor. She discussed the findings of the report that included an inventory of each crossing <br /> throughout the corridor. She said that since there were no major bridge reconstruction projects <br /> planned in the near future, there were no opportunities for MnDOT to add bicycle and pedestrian <br /> crossings along the 1-694 corridor in Arden Hills. She also stated that many of the roads in the <br /> study were City or County roads and were not under MnDOT's jurisdiction. <br /> Councilmember Holden stated the Council knows where the trail crossing gaps are and feels this <br /> study does not address the City of Arden Hills' issue with bicycle and pedestrian transportation <br /> over I-694. <br />
The URL can be used to link to this page
Your browser does not support the video tag.