My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-99 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1999-2009
>
1999
>
06-22-99 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2024 3:58:26 PM
Creation date
4/18/2016 11:11:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Arden Manor <br />Park Rehabilitation Concept <br />General <br />Park rehabilitation to include construction of an expanded play structure, a full court basketball facility and <br />relocation of an existing picnic shelter. Flood control enhancements to include construction of a floodway <br />drainage swale between the pond within the park and an inlet which exists at the southeast corner of the <br />park. Also constructed in association with the drainage swale will be a land bridge over the swale that will <br />connect park facilities to the access drive and office complex which serves the park. Grading and landscape <br />improvements will generally reflect the need to elevate park facilities above demonstrated flood levels and <br />buffer the setback zones between park facilities and residences. Some miscellaneous park features such as <br />benches and trash receptacles should also be considered. The following is a breakdown of each facility <br />described in further detail: <br />A. Play Structure <br />The existing play structure has been sited in the middle of the park. As the smallest park feature, it seems <br />disconnected from the other non -field sport activities. Locating the play structure closer to the park office <br />and emergency first aid facility will enhance user safety. Existing shade trees within the new location will <br />also enhance use of the new facility. Expansion of this facility from 625 s.f. to 4,000 s.f. would provide <br />better play value and allow for greater demand. A hard surface accessible path from the structure to an <br />emergency access route is also recommended. <br />B. Basketball Court <br />The existing half court is a fenced facility with bituminous pavement. It is one of the more popular use <br />areas that exist among them all. It may be possible to let it remain and avoid costs associated with a total <br />replacement. The layout in that case would be restricting the area planned to provide flood protection. The <br />proposal therefore is to relocate it to higher ground and pave it in concrete which will provide a better slip <br />resistant surface and one that is more cost effective over time. The new location will remain close to the <br />office and will also be accessible from the proposed land bridge. Salvaging fence fabric should be <br />considered. <br />C. Open Channel Floodway <br />Flooding is a chronic problem for the park which affects park use during peak season. As much as one <br />third of the park can be covered in water during a common flood event according to the residents. The <br />pond currently utilizes an outlet system that depends upon a 200', 10" diameter corrugated metal pipe <br />installed more than twenty five years ago at a minimum slope in this case that has likely silted in by now. <br />A supplemental ditch has been provided along the west side of the existing court facilities but the indirect <br />route will not handle the volume of flow in an efficient manner and divides the park uses further. The <br />proposed swale will replace the existing pipe and provide a maintainable solution to increasing flows over <br />time. A land bridge will span the swale utilizing drainage culverts sized to a capacity no less than the <br />existing structures draining the park to Round Lake. <br />D. Existing Picnic Shelter <br />The steel frame picnic shelter provides an enhanced picnic opportunity and should remain a part of the <br />park. Its elevation and relative proximity to the pond have placed it within flood prone areas. Its current <br />ground elevation is approximately 896. Proposed grading will elevate the other park facilities to <br />approximately two feet above this elevation. A minimum recommendation is to raise the structure higher <br />and infill around it. This would then require the grades in the current picnic shelter location to be raised <br />also. Further recommendation is to relocate the shelter closer to the other proposed park facilities to <br />consolidate the proposed area to receive fill. A new concrete slab under the shelter is included in the <br />4Dpreliminary cost estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.