Laserfiche WebLink
F <br /> Summer 2001 <br /> Park To Do List <br /> Arden Oaks <br /> 1. Trim around trees <br /> 2. Weed around trees <br /> 3. Mulch around trees <br /> 4. Swing set grooves <br /> 5. Paint swing chains <br /> 6. Add fiber to safety box (west of frog) <br /> 7. Basketball court needs resurfacing <br /> 8. Paint basketball court poles <br /> 9. Clcan out drain area from play structure <br /> 10. Water new grass seed area <br /> 11. Move picnic tables from basketball court to swing lot area <br /> Lind 's <br /> 1. Trim all trees <br /> Crepeau <br /> 1. Straighten out/support second section of the sportsman bridge <br /> 2. Paint swing bench poles <br /> 3. Trim tree limb,by trail, over street area <br /> 4. Pull out old trail mark post, south entrance <br /> Freeway <br /> 1. Fill in with black dirt tire tracks, lower level <br /> 2. Picnic table needs painting <br /> 3. Swing set grooves <br /> 4. Trim under swing bench <br /> 5. Paint red/blue lines in hockey rink <br /> 6. Trim tree suckers, lower level, west of basketball court <br /> 7. Paint door to warming house <br /> 8. Fix/repair and paint steps to warming house <br /> 9. Repair soffit of warming house <br /> 10. Put up parking lot chain and paint chain silver <br /> 11. Check out threshold, bottom of warming house <br />