Laserfiche WebLink
<br />City of Arden Hills <br />Planning Commission Meeting for April 6, 2016 <br />P:\Planning\Planning Cases\2016\PC 16-003 - Arden Square Master & Final PUD - 1160 County Road E\Memos_Reports_16-003 <br />Page 2 of 11 <br />1. Overview of Request <br /> <br />The proposed site improvements would modify the property’s drive lanes and parking stalls for a <br />more efficient use of space. The existing parking area on the north side of the building would be <br />rearranged to include two one-way drive aisles and angled parking stalls. One drive-up lane on <br />the west side of the building would be retained while the remaining lanes would be removed and <br />replaced with parking stalls. As a result of the project, the overall parking lot area would expand <br />by 2,182 square feet and 21 additional parking stalls spaces would be constructed. Other site <br />modifications would include a new monument sign, a trash enclosure constructed with <br />decorative rock face concrete block, bicycle racks, and updated pavement and sidewalk surfaces. <br />Landscaping on the property would be enhanced as well with additional tree and perennial <br />plantings at the County Road E entrance driveway and new parking lot landscape islands. <br /> <br />The project includes an upgrade to the property’s stormwater management system. The Rice <br />Creek Watershed District requires properties to manage runoff for different types of rainfall <br />events and to provide on-site infiltration and water quality treatment. This would be <br />accomplished through a new subsurface infiltration basin. On-site stormwater management <br />would also be improved with the connection of building roof drains to the catch basin at the <br />southeast corner of the property. <br /> <br />The applicant has provided a project narrative explaining the proposed work in more detail and <br />areas where flexibility from the City Code is needed (Attachment A). The proposed site, <br />landscaping, and stormwater management plans are included in Attachment C. <br /> <br /> <br />2. Planned Unit Development (PUD) Process: <br /> <br />The Special Requirements for the B-2 General Business District in Section 1320.085 of the <br />Zoning Code state that Site Plans approved for properties before November 24, 2008 will remain <br />in effect, but that the PUD process will be used for any future site amendments. In this case, a <br />Master and Final PUD are required for the proposed site modifications. <br /> <br />The PUD process is a tool that provides additional flexibility for development that an underlying <br />zoning district would not otherwise allow. For example, a PUD may make exceptions to <br />setbacks, lot coverage, parking requirements, signage, building materials, or landscaping <br />requirements. It is intended to overcome the limitations of zoning regulations and improve the <br />overall design of a project. While the PUD process allows the City to negotiate certain aspects of <br />the development, any conditions imposed on the PUD must have a rational basis related to the <br />expected impact of the development. <br /> <br />Arden Square has requested flexibility in two areas through the PUD process. First, flexibility <br />would be needed for the proposed landscape lot coverage of 14.6 percent where the zoning <br />regulations require a minimum of 20 percent coverage. Secondly, the proposed monument sign