Laserfiche WebLink
Page 1 of 1 <br /> <br />DATE: May 16, 2016 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Susan Iverson, Acting City Administrator <br /> <br />FROM: John Anderson, Acting Public Works Director <br /> <br />SUBJECT: Arden View Court Storm Sewer Repair <br /> <br /> <br />Requested Action <br /> <br />Provide staff with feedback on repair. <br /> <br />Discussion <br /> <br />A segment of storm sewer pipe in the Arden View Court Area has developed a crack and <br />separated joint. As result of the separated joint and crack, sink holes are forming in the rear yard <br />above the pipe. Public Works has looked at various options to repair this pipe and found that <br />lining would be the most cost effective means. We have obtained two quotes for this repair and <br />Hydro-Klean is the lowest at $13,353.00. The funding for this repair will be from the surface <br />water management fund. <br /> <br />Attachments <br /> <br />Attachment A: Pipe Inspection Report <br />Attachment B: Location Map <br />Attachment C: Quotes for repair <br /> <br />AGENDA ITEM – 1I <br /> <br /> <br />MEMORANDUM <br />