Laserfiche WebLink
The County will pay for 50% of the cost of the sidewalk/trail on the bridge that is <br />not paid for by the State. The City pays for 25% of the cost of the sidewalk/trail <br />on the bridge not paid for by the State. Pursuant to Agreement PUBW2016- <br />14(R) the City of Mounds View is also responsible for 25% of the cost of the <br />sidewalk/trail on the bridge not paid for by the State. <br /> <br />4.4. The City will pay 50% of the cost of the irrigation system. Pursuant to <br />Agreement PUBW2016-14(R) the City of Mounds View is responsible for the <br />remaining 50% of the cost. <br /> <br />4.5. Mobilization, Field Office, Erosion Control Supervisor, and Traffic Control are <br />defined collectively as the “Prorated Items”. The City percentage of the Prorated <br />Items is calculated as follows: <br /> <br />(City Cost excluding the Prorated Items Cost) <br />City % Prorated Items = <br />(Total Project Cost excluding the Prorated Items Cost) <br /> <br />The costs in the Prorated Items calculation will be based on contract unit prices <br />and quantities at the time of contract award. No adjustments in the percentages <br />will be made if unit prices or quantities vary during construction. <br /> <br />4.6. Design Engineering Costs <br /> <br />4.6.1. The City shall pay the County a design engineering fee equal to 12% of <br />the City’s share of the project items identified in Exhibit A and those <br />revisions requested by City. <br /> <br />4.6.2. Design engineering fees shall be calculated based on the quantities and <br />unit prices at the time of contract award. <br /> <br />4.7. Construction Engineering and Administration Costs <br /> <br />4.7.1. The City shall pay the County a construction engineering fee equal to <br />12% of the City’s share of the project items identified in Exhibit A and any <br />revisions requested by City. <br /> <br />4.7.2. Construction engineering and administration fees shall be calculated <br />based on the final contract quantities and unit prices. <br /> <br />5. Payment Schedule <br /> <br />5.1. Design engineering will be invoiced at the time of contract award. <br /> <br />5.2. The County will invoice the City for construction costs incurred on a monthly <br />basis or as determined by the payment schedule for the contractor. <br />