My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-31-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
05-31-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 3:26:30 PM
Creation date
5/27/2016 3:21:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br /> <br />possible for some other roads that are in worse shape to undergo reconstruction through a PMP <br />such as Indian Oaks Trail/ Floral Avenue or Benton Way / Harriet Avenue. <br /> <br />The City Council budgeted $150,000 in 2015 and 2016 for sealcoating/resurfacing with <br />sealcoating being on hold at the moment, it is our understanding that those dollars would go <br />towards resurfacing projects. In the case of Thom Drive the pavement alternatives available are <br />summarized in the table below along with the anticipated life expectancy of those alternatives. <br /> <br />Comparison of Alternatives 2016 cost Service Life <br />Future PMP - Reclaim $ 250,000 25 - 30 years <br />Contracted Overlay $ 52,500 8 to 10 years <br />Public Works Overlay $ 35,000 8 to 10 years <br />Do nothing / pothole filling $ 1,000 3 years <br /> <br /> <br />The Public Works Department’s intent is to stretch our maintenance dollars by utilizing the <br />equipment currently available and prolong the life of our pavements. <br /> <br /> <br />Attachments <br /> <br />Attachment A: Photos of Thom Drive <br />Attachment B: Photos of previous paving projects
The URL can be used to link to this page
Your browser does not support the video tag.