Laserfiche WebLink
Page 3 of 3 <br /> <br />possible for some other roads that are in worse shape to undergo reconstruction through a PMP <br />such as Indian Oaks Trail/ Floral Avenue or Benton Way / Harriet Avenue. <br /> <br />The City Council budgeted $150,000 in 2015 and 2016 for sealcoating/resurfacing with <br />sealcoating being on hold at the moment, it is our understanding that those dollars would go <br />towards resurfacing projects. In the case of Thom Drive the pavement alternatives available are <br />summarized in the table below along with the anticipated life expectancy of those alternatives. <br /> <br />Comparison of Alternatives 2016 cost Service Life <br />Future PMP - Reclaim $ 250,000 25 - 30 years <br />Contracted Overlay $ 52,500 8 to 10 years <br />Public Works Overlay $ 35,000 8 to 10 years <br />Do nothing / pothole filling $ 1,000 3 years <br /> <br /> <br />The Public Works Department’s intent is to stretch our maintenance dollars by utilizing the <br />equipment currently available and prolong the life of our pavements. <br /> <br /> <br />Attachments <br /> <br />Attachment A: Photos of Thom Drive <br />Attachment B: Photos of previous paving projects