Laserfiche WebLink
<br />The CIPP pipe designs are based on information provided by the customer and should be <br />verified by the customer prior to proceeding with this project. Should any other <br />conditions, existing or expected in the field, over the design life of the Insitupipe differ <br />from the information based herein, then the appropriate adjustments should be made to <br />the design calculations, along with the appropriate price adjustment. <br /> <br />Description Field Condition <br />Nominal Pipe Diameter: 18” round <br />Operating Temperature: Less than 100 degrees <br />Effluent Type: Storm <br />Number of Service Connections: N/A <br />Soil Depth over Invert: 8’ - 10’ <br />Reason for Rehabilitation: Fully deteriorated, infiltration <br /> <br /> <br />PROPOSAL INCLUSIONS <br /> <br />• Certificate of Insurance with standard coverage (see attached) <br /> <br />• One mobilization and demobilization <br /> <br />• Final cleaning of loose debris from the piping prior to installation <br /> <br />• As-built video inspection and CD <br /> <br />• Standard PPE for installation crew <br /> <br />• Standard one-year warranty <br /> <br /> <br />PROPOSAL EXCLUSIONS <br />The prices stated in this proposal do not include the following items. If provided by <br />Contractor, the cost will be charged as extras; otherwise Owner will furnish these items at <br />no cost to Contractor: <br /> <br />• Performance/Payment Bond (at 2.5% of proposal price) <br /> <br />• Special Insurance such as OCP, Builders Risk <br /> <br />• Water from a fire hydrant or other high volume source within a convenient <br />distance <br /> <br />• Removal and disposal of any hazardous or toxic materials encountered <br /> <br />• Any holiday work, nighttime work, rush delivery or adverse weather work