My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-20-16-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
06-20-16-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2016 8:35:11 AM
Creation date
6/17/2016 8:32:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 3 <br />• Advertise and evaluate bids. <br /> <br />c. Construction <br />• Provide overall contract/project management acting on behalf of and as <br />an agent for the City. <br />• Conduct pre-construction meetings and coordinate with other utility <br />companies, contractors, governmental agencies, etc., to ensure the <br />proper scheduling, permit applications and general supervision of public <br />and private improvement contracts. <br />• Perform construction staking and location surveying. <br />• Perform inspection and construction observation services to ensure <br />compliance with City standards and approved plans and specifications. <br />• Document the type and location of public improvement installations and <br />prepare accurate record plans reflecting all changes or modification. <br />• Prepare contract Close-Out Reports and perform the testing and <br />inspections necessary to recommend acceptance to staff and the City <br />Council. <br />• Prepare public information materials (newsletters, notices, reminders) <br />for distribution to properties affected by construction. <br /> <br />d. Assessments <br />• Assists the City staff in determining the proper and equitable assessment <br />rates to properly finance public improvement projects. <br />• Provide cost breakdown of all related project costs to allow City staff to <br />prepare a detail assessment allocation. <br /> <br />3. Traffic Engineering and Transportation Planning <br />• Traffic forecasting <br />• Capacity analysis <br />• Traffic impact studies/mitigation analysis <br />• Review of Traffic Impact Studies prepared by developers <br />• Signal justification reports <br />• Pedestrian/bike facility design <br />• Traffic Signals/Signage Studies <br />• Speed Zone Studies <br />• Environmental documentation <br /> <br />4. Surface Water Resources Engineering <br />• Compliance review with Stormwater Management Plan <br />• Hydrologic analysis/Hydraulic design <br />• Storm water modeling <br />• Storm sewer design and analysis <br />• Water quality Studies/monitoring <br />• Erosion control <br />• Wetland delineation and mitigation analysis <br />• Storm water Best Management Practice (BMP) design and maintenance <br />• NPDES – MS4 permit compliance <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.