My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
06-17-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 11:37:27 AM
Creation date
7/6/2016 11:23:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 3 <br /> Advertise and evaluate bids. <br /> <br />c. Construction <br /> Provide overall contract/project management acting on behalf of and as <br />an agent for the City. <br /> Conduct pre-construction meetings and coordinate with other utility <br />companies, contractors, governmental agencies, etc., to ensure the <br />proper scheduling, permit applications and general supervision of public <br />and private improvement contracts. <br /> Perform construction staking and location surveying. <br /> Perform inspection and construction observation services to ensure <br />compliance with City standards and approved plans and specifications. <br /> Document the type and location of public improvement installations and <br />prepare accurate record plans reflecting all changes or modification. <br /> Prepare contract Close-Out Reports and perform the testing and <br />inspections necessary to recommend acceptance to staff and the City <br />Council. <br /> Prepare public information materials (newsletters, notices, reminders) <br />for distribution to properties affected by construction. <br /> <br />d. Assessments <br /> Assists the City staff in determining the proper and equitable assessment <br />rates to properly finance public improvement projects. <br /> Provide cost breakdown of all related project costs to allow City staff to <br />prepare a detail assessment allocation. <br /> <br />3. Traffic Engineering and Transportation Planning <br /> Traffic forecasting <br /> Capacity analysis <br /> Traffic impact studies/mitigation analysis <br /> Review of Traffic Impact Studies prepared by developers <br /> Signal justification reports <br /> Pedestrian/bike facility design <br /> Traffic Signals/Signage Studies <br /> Speed Zone Studies <br /> Environmental documentation <br /> <br />4. Surface Water Resources Engineering <br /> Compliance review with Stormwater Management Plan <br /> Hydrologic analysis/Hydraulic design <br /> Storm water modeling <br /> Storm sewer design and analysis <br /> Water quality Studies/monitoring <br /> Erosion control <br /> Wetland delineation and mitigation analysis <br /> Storm water Best Management Practice (BMP) design and maintenance <br /> NPDES – MS4 permit compliance <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.