My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
07-11-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2016 10:32:26 AM
Creation date
7/11/2016 10:28:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AA/EOE <br />Braun Intertec Corporation <br />11001 Hampshire Avenue S <br />Minneapolis, MN 55438 <br />Phone:952.995.2000 <br />Fax: 952.995.2020 <br />Web: braunintertec.com <br />July 6, 2016 Proposal QTB041553 <br />Mr. John Anderson <br />City of Arden Hills <br />1425 Paul Kirkwold Drive <br />Arden Hills, MN 55112 <br />Re: Proposal for a Geotechnical Evaluation <br />Johanna Marsh Park Tennis Court Reconstruction <br />3168 Ridgewood Road <br />Arden Hills, Minnesota <br />Dear Mr. Anderson: <br />Braun Intertec Corporation respectfully submits this proposal to complete a geotechnical evaluation for <br />tennis court reconstruction at the referenced site. <br />Our Understanding of Project <br />Per your e-mail, the existing tennis court was originally constructed in 1974 and is experiencing some <br />settlement. We also understand the desire to reconstruct the court to and build it to a “50-year” <br />pavement design standard. <br />Purpose <br />The purpose of our geotechnical evaluation will be to characterize subsurface geologic conditions at <br />selected exploration locations and evaluate their impact on the design and construction of the Johanna <br />Marsh Park tennis court. <br />Scope of Services <br />The following tasks are proposed to help achieve the stated purpose. If unfavorable or unforeseen <br />conditions are encountered at any point during the completion of the tasks that lead us to recommend <br />an expanded scope of services, we will contact you to discuss the conditions before resuming work. <br />Site Access, Staking and Utility Clearance <br />Based on the narrow access, it appears that the site will require a skid-mounted drill rig. <br />You have requested we subcontract with a fence contractor to remove and replace fence panels as <br />needed to provide access to the court. An estimate of these costs is provided in our budget. We assume <br />the City will temporarily remove the court net to allow us to access both sides of the court with our <br />drilling equipment.
The URL can be used to link to this page
Your browser does not support the video tag.