<br /> <br /> <br /> <br /> <br />Project areas were grouped to pull together work into neighborhoods. Priority was given to <br />projects that had a PCI rating under 60 or that lent themselves to smaller paving projects the <br />Public Works department could under take. The recommended strategy takes into account the <br />need for utility repairs and replacement, the need for storm sewer additions, the existing PCI and <br />anticipated soil issues. We do not see any opportunities to do a straight overlay as a public <br />works paving project but there are a number of streets that if we contract to have milling done <br />public works could do the paving. The following table shows the full range of options for each <br />project with the recommended option highlighted. The project areas are shown on the attached <br />exhibit. <br /> <br />