Construction Staging <br />•Four year construction Project <br />•Construction Hours (noise), possible <br />locations of concrete plants, and grinding <br />operations <br />•CR I and CR C will remain open during <br />construction with only short term closures <br />•Rosegate will be closed during bridge <br />construction <br />I-35W North Corridor Managed Lane EA and Pre-Design