Laserfiche WebLink
TCAAP INFRASTRUCTURE MAINTENANCE MATRIX <br />JUNE 26, 2015 <br />COUNTY CITY OTHERS <br />ROADWAY <br />SPINE ROAD <br />SNOW PLOWING X <br />REPAIR/MAINTENANCE X <br />FUTURE RECONSTRUCTION X <br />BRIDGE X <br />HIGHWAY 96 TRAFFIC SIGNAL X <br />FUTURE TRAFFIC SIGNALS X <br />THUMB ROAD <br />SNOW PLOWING X <br />REPAIR/MAINTENANCE X <br />FUTURE RECONSTRUCTION X <br />TRAILS <br />SPINE ROAD X <br />THUMB ROAD X <br />NATURAL RESOURCES CORRIDOR X <br />REGIONAL TRAIL X Maintenance by Ramsey County Parks. <br />LANDSCAPE <br />SPINE ROAD X <br />THUMB ROAD X <br />GATEWAYS X <br />TOWN CENTER X <br />ADDITIONAL SNOW REMOVAL X <br />GREEN CROSSINGS (ALONG SPINE ROAD)X <br />IRRIGATION (IF ANY)X <br />STREET LIGHTING <br />SPINE ROAD INTERSECTIONS X <br />SPINE ROAD PEDESTRIAN SCALE X X Pedestrian scale lighting could be maintained by City or private entity. <br />THUMB ROAD INTERSECTIONS X <br />THUMB ROAD PEDESTRIAN SCALE X X Pedestrian scale lighting could be maintained by City or private entity. <br />I-35W/COUNTY ROAD H BRIDGE X <br />COUNTY ROAD H (WEST OF I-35W) <br />SOUTHBOUND I-35W RAMP ROUNDABOUT X <br />HIGHWAY 10 INTERSECTION X <br />OFF ROAD TRAIL LIGHTING (IF ANY) <br />NATURAL RESOURCE CORRIDOR TRAIL No lighting proposed. Lighting could be provided in the future by adjacent roadway lighting. <br />REGIONAL TRAIL No lighting proposed. <br />STORM DRAINAGE <br />NATURAL RESOURCE CORRIDOR PONDS X County may have some cost responsibilities based on the County's cost participation policy. <br />NATURAL RESOURCE CORRIDOR WETLANDS X <br />TRUNK STORM SEWER AND MANHOLES X City to maintain per County policy. <br />LATERAL STORM SEWER AND MANHOLES X County to maintain per County policy. <br />SANITARY SEWER <br />TRUNK SANITARY SEWER AND MANHOLES X <br />LIFT STATION X <br />WATER SYSTEM <br />TRUNK WATER MAIN X <br />WATER TOWER X <br />BOOSTER STATION X <br />OTHER <br />TGRS SYSTEM/TREATMENT FACILITIES X <br />County will maintain for up to the first 5 years. City will assume maintenance responsibilities after <br />the required maintenance period. <br />Ownership and maintenance of the emergency water main connection under I-35W to the Mounds <br />View system needs to be resolved. <br />Maintained by the Army. Easements need to be established for this system since some of the <br />system falls outside of existing and proposed roadway and utility right-of-way/easements. <br />County will have jurisdiction for and provide all maintenance for the Thumb Road. <br />Maintenance of any landscape/streetscape amenities within the public right-of-way (above and <br />beyond typical street maintenance) will be the responsibility of a third party outside of County or <br />City maintenance forces. <br />City may have some operation/maintenance cost responsibilities based on the County's cost <br />participation policy. <br />City may have some operation/maintenance cost responsibilities based on the County's cost <br />participation policy. <br />MAINTENANCE RESPONSIBILITIES NOTESITEM <br />County will have jurisdiction for and provide all maintenance for the Spine Road. City may have <br />some operation/maintenance cost responsibilities for traffic signals based on the County's cost <br />participation policy.