My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
07-25-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2016 9:28:10 AM
Creation date
7/25/2016 8:58:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br /> <br />An Equal Opportunity Employer <br /> <br /> <br />Planned Project Schedule <br />The project is not yet fully funded and does not have a definitive construction start date. The <br />anticipated schedule is: <br /> August 2018: Project Letting. <br /> September 2018: Minor construction begins with limited lane closures and minor traffic <br />impacts. <br /> April 2019: Major construction begins with major lane and ramp restrictions and major traffic <br />impacts. <br /> November 2023: Construction is completed. <br /> <br />The existing freeway is mostly 6-lanes south of CR J. All 6-lanes will be open over each winter <br />season. The freeway will be reduced to 4-lanes during the first stage, which will last 1.5 <br />construction seasons. The second stage will have 5-lanes open, which will last another 1.5 years. <br />The third stage will complete the pavement work north of CR J and keep 4-lanes open and will last <br />one more construction season. <br /> <br />City’s Estimated Project Costs <br />If the city has requested to have city items added to the project (e.g., utilities, sidewalks), ask the <br />city to provide their estimate of the costs for these items and use the city’s estimate in this <br />submittal. <br /> <br />For cost estimates, sometimes it is better to give range rather than a specific number. <br /> <br />Some project costs are the City’s responsibility, as detailed in MnDOT’s cost participation policy. <br />(See the policy and the Cost Participation and Maintenance with Local Units of Government <br />Manual at MnDOT’s this website: http://www.dot.state.mn.us/policy/financial/fm011.html). <br /> <br />At this time, the City does not have any cost participation in this project. There are no signals being <br />reconstructed, and the City has not asked to add any work such as additional local street <br />reconstruction or utility work. <br /> <br />City’s Maintenance Responsibilities <br />At this time there are no new City maintenance responsibilities. We are not adding new trails or <br />bridges. <br /> <br /> <br />Please feel free to contact me if you have any questions about this submittal. <br /> <br />Sincerely, <br /> <br /> <br />Jerome Adams
The URL can be used to link to this page
Your browser does not support the video tag.