Laserfiche WebLink
AGENDA ITEM – 8A <br /> <br /> <br />City of Arden Hills <br />City Council Meeting for July 25, 2016 <br /> <br />P:\Planning\Planning Cases\2016\PC 16-016 - Land O'Lakes - Final PUD Phase 2\Memos_Reports_16-016 <br />Page 12 of 13 <br />11. Final grading, drainage, utility, and site plans shall be subject to approval by the <br />Public Works Director, City Engineer, and City Planner prior to the issuance of a <br />grading and erosion control permit or other development permits. <br />12. That upon completion of grading and utility work on the site, a grading as-built and <br />utility as-built shall be provided to the City for review. <br />13. That the final Lighting and Photometric Plan for Phase 2 shall be reviewed and <br />approved by the City prior to the issuance of a grading and erosion control permit for <br />Phase 2. <br />14. That the existing employee entrance sign shall be moved from the east entrance along <br />County Road F to the new main entrance across from Innovation Way. The sign shall <br />meet all applicable setback requirements. <br />15. That the main entrance to the site at County Road F West and Innovation Way shall <br />be constructed as a signalized intersection in order to meet the peak hour traffic <br />volumes. Final plans for this improvement shall be approved by Ramsey County and <br />the City Engineer. Required intersection improvements shall be substantially <br />completed prior to the issuance of a Final Certificate of Occupancy for the Phase 2 <br />office building. <br />16. That the developer shall construct or pay for the construction of the intersection <br />improvements at County Road F West and Innovation Way or a reduced percentage <br />of the cost if the City is successful in recovering assessments or other financial <br />paym ents from other benefitting properties. <br />17. That the western access along County Road F West to the site shall be constructed as <br />a 3/4 access in order to prohibit left-turn maneuvers from the site. Final plans for this <br />improvement shall be approved by Ramsey County and the City Engineer. The <br />Developer shall construct or pay for the construction of a right turn lane on County <br />Road F West into the western access, if required by Ramsey County. If such <br />improvement is required, it shall be completed prior to the issuance of a Final <br />Certificate of Occupancy for the Phase 2 office building. The western access may <br />maintain “full access” status until the Final Certificate of Occupancy is issued. <br />18. That the eastern access along County Road F West to the site shall be constructed as a <br />3/4 access in order to prohibit left-turn maneuvers from the site. Final plans for this <br />improvement shall be approved by Ramsey County and the City Engineer. <br />19. That the eastern access along County Road F West shall be for deliveries purposes <br />only. Access to the main parking lot through the east access point shall be provided <br />for emergency vehicles only. This access shall not be used as an employee entrance. <br />Final plans for this improvement shall be approved by Ramsey County and the City <br />Engineer. <br />20. That roof-mounted mechanical equipment shall be screened from public view. <br />21. That the final plan for both Phase 1 and Phase 2 of the project shall be revised to meet <br />the standards as outlined by the City Engineer in the memo dated June 27, 2016. <br />22. That the applicant shall conform to all other City regulations. <br />