Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – July 6, 2016 7 <br /> <br />the existing system. He stated he would see if a custom unit could be designed to reduce the size, <br />otherwise the unit would be painted to match the building. <br /> <br />Mr. Slack explained that the site lines had been considered on each side of the building and he <br />believed the HVAC unit would be well screened. <br /> <br />Commissioner Lambeth asked how the HVAC unit would be secured to the building. <br /> <br />Mr. Philstrom described how the steel structure would be braced to the roof. <br /> <br />Commissioner Lambeth inquired what building materials would be used on the corporate <br />expansion building. <br /> <br />Mr. Philstrom reported the building would be covered in brick, clear glass, and a dark gray <br />metal paneling. <br /> <br />Commissioner Jones questioned if the vestibule would have a green roof. <br /> <br />Mr. Philstrom stated this area would have a green roof and explained the remainder of the <br />building would have a white membrane that would reflect the sun’s rays. <br /> <br />Commissioner Jones requested further information on the LEED qualities within the building. <br /> <br />Mr. Philstrom reviewed the numerous LEED amenities within the building, noting the building <br />would have LED lighting and would have a structurally sound envelope. <br /> <br />Commissioner Gehrig asked if the four story design was necessary. <br /> <br />Mr. Slack discussed the topography of the property. He believed the four story design best met <br />the needs for the site and offered connectivity at grade and below grade between the two <br />corporate buildings. <br /> <br />Commissioner Zimmerman moved and Commissioner Jones seconded a motion to <br />recommend approval of Planning Case 16-016 for a Final Planned Unit Development <br />(PUD) for Phase 2 at 4001 Lexington Avenue North, based on the findings of fact, <br />submitted plans, and the twenty-two (22) conditions in the July 6, 2016, Report to the <br />Planning Commission. <br /> <br />Commissioner Zimmerman thanked the representatives from Land O’Lakes for their thorough <br />presentation. <br /> <br />Chair Thompson supported the height flexibility as it was consistent with the other building on <br />the corporate campus. She believed the proposed screening would blend in nicely with the <br />building. She appreciated all of the plantings on site. She recommended that police and fire <br />access be maintained throughout the construction time period. <br /> <br />The motion carried unanimously (6-0). <br />