My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2016
>
06-27-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:09:06 AM
Creation date
7/27/2016 12:30:46 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—JUNE 27, 2016 15 <br /> City Planner Streff noted the Planned Unit Development process is a tool that provides <br /> additional flexibility for development that an underlying zoning district would not otherwise <br /> allow. For example, a PUD may make exceptions to setbacks, lot coverage, parking requirements, <br /> signage, building materials, or landscaping requirements. It is intended to overcome the <br /> limitations of zoning regulations and improve the overall design of a project. While the PUD <br /> process allows the City to negotiate certain aspects of the development, any conditions imposed <br /> on the PUD must have a rational basis related to the expected impact of the development. A PUD <br /> cannot be used to permit uses that would not otherwise be permitted in the underlying zoning <br /> district. <br /> City Planner Streff explained the first step in the PUD process is the Master PUD, which is a <br /> detailed concept plan for the entire development proposal, often outlining individual phases for <br /> development over a specified period of time. The second step is the Final PUD for each phase, <br /> which is a more detailed review as each development phase moves forward. During the Master <br /> PUD stage, the City works with the applicant to set an overall design framework or standard for a <br /> proposed development. These standards are then written into a development agreement which <br /> generally includes the design standards, a list of conditions,the size of the development, and what, <br /> if any, deviations from the underlying zoning district will be permitted. Once the Master PUD is <br /> approved, the applicant then creates a development that conforms to the development agreement <br /> for each subsequent Final PUD phase. The level of detail is guided by the type and scale of the <br /> development as well as the guidance or flexibility within the Zoning Code. <br /> City Planner Streff reviewed the Plan Evaluation,the Sign Code Review and Subdivision Code. <br /> City Planner Streff stated the Planning Commission reviewed Planning Case 16-014 at their <br /> regular meeting on June 8, 2016. Draft minutes from the meeting are included in Attachment G. <br /> The Planning Commission offers the following eleven(11) findings of fact for consideration: <br /> General Findings: <br /> 1. The applicant is requesting approval of a Master Planned Unit Development (PUD) <br /> Agreement & Final PUD for Phase 1 of the Land O'Lakes Corporate Headquarters <br /> consolidation plan located at 4001 Lexington Avenue North. <br /> 2. Phase I of the Land O'Lakes Corporate Headquarters consolidation plan includes the <br /> expansion of the south parking lot on the campus and Phase 2 includes the construction of <br /> a new four-story office building along with the reconfiguration and expansion of the <br /> parking area on the north side of the campus. <br /> 3. The PUD process allows for flexibility within the City's regulations through a negotiated <br /> process with a developer. <br /> 4. The Land O'Lakes property is comprised of 47.37 acres. <br /> 5. The Land O'Lakes property is located at 4001 Lexington Avenue North. <br /> 6. The Land O'Lakes property is located in the I-1 —Limited Industrial District. <br /> 7. The proposed use is a permitted use in the I-1 —Limited Industrial District. <br /> 8. The Master Planned Unit Development(PUD)Amendment and Final PUD for Phase 1 are <br /> in substantial conformance with the requirements set forth in the City's Zoning Code and <br /> design standards. <br /> 9. Where the plan is not in conformance with the City's Zoning Code, flexibility has been <br /> requested by the applicant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.