My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
08-08-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 10:53:39 AM
Creation date
8/5/2016 10:49:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agenda Item 6A <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1378 <br /> <br /> <br />To: Michelle Wolfe/Arden Hills <br />City Administrator <br /> <br /> File: 31809368 <br /> <br />From: Gregory S. Brown <br />Arden Hills City Engineer <br /> <br />Date: October 7, 2004 <br /> <br />Subject: County Road E Trail Improvements <br /> <br /> <br />Background <br />The City of Arden Hills developed a Parks and Trails Master Plan, which outlines the <br />improvements for parks and trails throughout the City. The Plan was adopted in 2002 after a <br />resident survey was conducted and indicated that expanding the trail network was a high priority. <br />The Plan aims to connect the Arden Hills’ community through an efficient and safe trail system <br />that will provide residents an opportunity for healthy exercise and inter-community <br />connectedness. Currently there are very narrow walkways on both sides of the bridge. These <br />inadequate walkways along the County Road E bridge over TH51 are the only crossing between <br />Lydia Avenue in Roseville and I-694. This area is considered a weak link in the trail system and <br />a “choke point” for pedestrian traffic. For these reasons, the Council directed staff to look into <br />improving the pedestrian crossing and sidewalk options. The proposed plan would extend the <br />trail system across County Road E bridge to Lindey’s Park. Future trail plans include a trail that <br />will connect Lake Johanna to Lindey’s Park and another trail that will traverse north and south <br />from Lindey’s Park along Snelling Avenue and Old Highway 10. <br /> <br /> <br />Existing Conditions on County Road E Bridge
The URL can be used to link to this page
Your browser does not support the video tag.