Laserfiche WebLink
there is no area for snow storage. Snow removal operations normally begin within twenty-four <br />(24) hours after snowplowing operations have been completed. <br /> <br />There are approximately sixty (60) cul-de-sacs in Arden Hills. It may take some time for the <br />specialized equipment to complete the actual cul-de-sac areas; therefore, a snowplow may <br />complete the normal part of the street and complete only a portion of the cul-de-sac. <br /> <br />The major portion of the cul-de-sac will be plowed by the special equipment during the usual <br />time guidelines for snowplowing operations. Snow removal may be required in cul-de-sac areas <br />if previous snow accumulations prevent normal movement of snow to boulevard areas. <br /> <br />SNOW REMOVAL FOR CITY SIDEWALKS AND TRAILS <br />The City of Arden Hills does maintain most sidewalks and trails. Arden Hills sidewalk <br />snow plowing begins as soon as possible after a significant snowfall. The City will <br />maintain sidewalks and trails only after all City streets have been plowed. Sidewalks and trails <br />that are maintained by the City during the winter months will be cleared of <br />accumulated snow but will not be maintained to a "clean pavement" condition. The <br />following sidewalk and trail areas will not be maintained byv the City's Operations and <br />Maintenance Department in the winter months due to steep grades or dangerous sidewalk <br />conditions: <br /> <br />• • Arden View Drive to Colleen Avenue Trail <br />• • Cummings Park-Lexington Avenue to Cummings Ball Field <br />• • Cummings Park-North Water Tower to Hamline Avenue <br /> <br />The City of Arden Hills will post the aforementioned trail locations as "Minimal <br />Maintenance Trails" during the winter months. <br /> <br />Special priority is given to school routes along a few sidewalks and trails. All efforts will be <br />made to clear the following sidewalks/trails by 7:00 AM: <br /> <br />• Trail along County Road E2 <br />• Trail from Venus Avenue to County Road E2 <br />• Trail along Lake Valentine Road <br /> <br />PROPERTY DAMAGE <br />Snowplowing and ice control operations may cause property damage even under the best of <br />circumstances and care on the part of the operator. The major types of damage are to <br />improvements within the City right-of-way, which extends approximately ten to fifteen feet <br />beyond the curb locations. The intent of the right-of-way is to provide room for snow storage, <br />utilities, boulevard trees, sidewalks and other City uses. <br /> <br />The City will repair sod that was damaged by a City snowplow. Operations and <br />Maintenance Department staff members will repair the sod damage with black dirt and <br />grass seed. All other damage within the public right-of-way is the responsibility of the