My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-16-Joint WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2016
>
08-15-16-Joint WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:14:20 AM
Creation date
9/14/2016 10:07:05 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION <br /> AND JOINT WORK SESSION WITH JDA—AUGUST 15, 2016 4 <br /> Mr. Shaver reported Alatus was currently thinking of building three buildings over six stories, <br /> two condo buildings and a portion of one apartment building. <br /> Councilmember Wicklund asked for more information on Main Street and whether this roadway <br /> could be made a strictly walking street. <br /> Mr. Shaver commented he would love to be able to make this strictly a walking street. However, <br /> developers favored streets that accommodated vehicular traffic. <br /> Councilmember McClung inquired if the developer had any traffic counts for the theater area. <br /> Mr. Shaver stated this has not been tested yet. <br /> Councilmember Wicklund asked if there were any other connectors, other than bus rapid transit, <br /> that would connect the two areas of the City. <br /> Mr. Shaver commented Alatus was trying to create a connector or touchstone for Arden Hills. <br /> He understood it was hard to consider moving City Hall, however, this would assist with the <br /> major transformation that would be coming to the City. <br /> Councilmember Wicklund supported the relocation of City.Hall. <br /> Mayor Grant commented on how the residents may perceive the movement of City Hall. He <br /> anticipated the City Council would have to further discuss the Town Center plan and the proposed <br /> building heights. He appreciated the proposed concept plan and wanted to hear more about <br /> vertical mixed uses. <br /> .JDA Chair Sand supported the overall plan. He discussed the importance of interconnectivity of <br /> this site to the remainder of Arden Hills. He believed City Hall needed to be connected to the <br /> remainder of the City. He questioned how Alatus would be connecting pedestrians from north <br /> side of Highway 96 to the south side of Highway 96. He suggested the bandshell be located near <br /> the water feature. lle provided further comment on the streetscape. <br /> Councilmember Holden requested further information on the condominium building height. <br /> Mr. Lux commented on the anticipated condominium building height and construction <br /> specifications. He agreed a connection over Highway 96 would be imperative. <br /> Mayor Grant questioned if the geotechnical would support a building of this height. <br /> Mr. Lux discussed the subsurface information he had on the site. <br /> Mayor Grant went on record stating he wanted there to be a water feature on the property and not <br /> just a holding pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.