My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-16-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2016
>
09-26-16-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2016 2:47:27 PM
Creation date
9/23/2016 2:42:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />FIRM SCHEDULE 1 <br />Elfering & Associates $16,450.00 <br />WSB & Associates $26,741.00 <br />SEH $57,600.00 <br />Kimley Horn $57,720.00 <br /> <br />Due to the proximity of the proposed trail location to a wetland located along the west side of <br />Snelling Avenue and coordination with Ramsey County, staff believes that the preliminary <br />design is needed to determine the most feasible location for the trail as previous options <br />presented included either a boardwalk segment or narrowing of Snelling Avenue. Once the <br />preliminary design is completed, staff will return to Council with proposals for final design and <br />construction phase services. Elfering & Associates has indicated that preliminary design could <br />be completed by the end of the year. <br /> <br /> <br /> <br />ATTACHMENT A: Engineering RFP <br />ATTACHMENT B: Elfering & Associates Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.